Paragraph 8 Drainage and aerial emissionsI1

England, Wales and Scotland

(1)

No authorised development shall commence until written details of the surface water, foul water and process waste water drainage systems (including means of pollution control) have, after consultation with Natural Resources Wales and Dwr Cymru (Welsh Water), been submitted to and approved by the relevant planning authorities.

(2)

The written details must reflect the drainage proposals set out in sections 4.3.21 to 4.3.31 of volume 1 of the environmental statement and in particular must stipulate that any process waste water discharges from the authorised development into the Milford Haven Waterway must operate through the existing infrastructure in place for the South Hook LNG Terminal that is co-located at or near the site.

(3)

The surface water, foul water and process waste water drainage systems must be constructed and operated in accordance with the approved details.

(4)

The contribution of the process waste water discharge along with the aerial emissions from the authorised development, in combination with the process waste water discharges and aerial emissions from the South Hook LNG Terminal—

(a)

must not increase overall nitrate loads into the Pembrokeshire Marine SAC from the levels permitted by Environmental Permitting Regulations Permit Number XP3538LD for the South Hook LNG Terminal as varied by Variation Number XP3535ME; and

(b)

must ensure no adverse effect on the integrity of the Pembrokeshire Marine SAC as a result of other contaminants emitted or discharged by the authorised development.

Annotations

Commencement

I1

Sch. 2 para. 8 in force at 23.10.2014, see art. 1