Paragraph 6 I1

Northern Ireland

The premises shall have sufficient capacity of hot water and steam production to render specified bovine material in accordance with the method in this Schedule chosen by the operator.

(7)

The equipment used to render specified bovine material shall include—

(a)

measuring equipment to check temperature and, if necessary, pressure at critical points;

(b)

recording devices to record continuously the results of measurements;

(c)

an adequate safety system to prevent insufficient heating.

(8)

To prevent recontamination of processed specified bovine material by incoming specified bovine material, there must be clear separation between the area of the premises where the incoming specified bovine material is unloaded and rendered and the area set aside for further processing of the heated specified bovine material and the storage of finished specified bovine material products.

Annotations

Commencement

I1

Sch. Pt. I para. 6 in operation at 29.3.1996, see art. 1