Article 30 Temporary use of land for constructing the authorised developmentI1
England and Wales
The undertaker may, in connection with the construction of the authorised development but subject to article 22 (time limit for exercise of authority to possess land temporarily or to acquire land compulsorily)—
enter on and take temporary possession of—
so much of the land specified in column 1 of the table in Schedule 11 (land of which temporary possession may be taken) for the purpose specified in relation to the land in column 2 of that table; and
remove any buildings, structures, agricultural plant and apparatus, electric lines, drainage, fences, debris and vegetation from that land;
construct temporary works (including means of access), haul roads, security fencing, bridges, structures and buildings on that land;
use the land for the purposes of a temporary working site with access to the working site in connection with the authorised development;
construct any works on that land as are mentioned in Schedule 1 (authorised development); and
carry out mitigation works on that land required under the requirements in Schedule 2 (requirements).
Paragraph (1) does not authorise the undertaker to take temporary possession of—
any house or garden belonging to a house; or
any building (other than a house) if it is for the time being occupied.
Not less than 28 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.
The undertaker must not, without the agreement of the owners of the land, remain in possession of any land under this article—
in the case of the land referred to in paragraph (1)(a)(i) after the end of the period of one year beginning with the date of final commissioning of the part of the authorised development for which temporary possession of the land was taken; or
in the case of land referred to in paragraph (1)(a)(ii) after the end of the period of one year beginning with the date of final commissioning of the part of the authorised development for which temporary possession of the land was taken unless the undertaker has, before the end of that period, served a notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act in relation to that land.
Unless the undertaker has served notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act or otherwise acquired the land or rights over land subject to temporary possession the undertaker must, before giving up possession of land of which temporary possession has been taken under this article, remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but the undertaker is not required to—
replace any building, structure, agricultural plant or apparatus, electric line, debris, drain or vegetation removed under this article;
remove any drainage works installed by the undertaker under this article;
remove any new road surface or other improvements carried out under this article to any street specified in Schedule 4 (streets subject to street works), Schedule 5 (alteration of streets) or Schedule 7 (access to works);
remove any fencing or boundary treatments installed by the undertaker under this article to replace or enhance existing fencing or boundary treatments;
restore the land on which any works have been carried out under paragraph (1)(f) insofar as the works relate to mitigation works identified in the environmental statement or required pursuant to the requirements in Schedule 2;
remove any protective works which have been placed on the land under article 19 (protective work to buildings); or
remove any measures installed over or around statutory undertakers’ apparatus to protect that apparatus from the authorised development.
The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of any power conferred by this article.
Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of the compensation, must be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
Subject to article 49 (no double recovery), nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (6).
Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
The undertaker must not compulsorily acquire, acquire new rights over or impose restrictive covenants over, the land referred to in paragraph (1)(a)(i) under this Order.
Nothing in this article prevents the undertaker from—
creating and acquiring new rights or imposing restrictions over any part of the Order land identified in Schedule 9 (land in which only new rights etc. may be acquired); or
Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
Nothing in this article prevents the taking of temporary possession more than once in relation to any land that the undertaker takes temporary possession of under this article.
Annotations
Commencement
- I1
Art. 30 in force at 30.4.2026, see art. 1
Footnotes
- f1
-
Section 11 was amended by section 34(1) of, and paragraph 14(3) of Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186, 187 and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 and S.I. 2009/1307.
- f2
-
Section 4 as amended by section 184 and 185 of, and paragraphs 1 and 2 of Schedule 18 to, the Housing and Planning Act 2016.