Schedule THE SCHEDULE TO THE SCHEME
The location and general design of the footbridge are shown on the Plan being Job No. 114 Drawing No. 2000 Rev 2 and marked “The Stockton-on-Tees Borough Council North Shore Development (North Shore Footbridge) Scheme 2006” (hereinafter referred to as “the Plan”).