HIGHWAYS, ENGLAND

Made 7th September 2006

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980f1 and now vested in himf2:

Annotations to the whole text

Footnotes

f1

1980 c. 66.

f2

S.I. 1981/238.

Contents

  1. 1Section 1
  2. 2Section 2
  3. 3Section 3
  4. Signature
  5. Schedule THETHE STOCKTON-ON-TEES BOROUGH COUNCIL NORTH SHORE DEVELOPMENT (NORTH SHORE FOOTBRIDGE) SCHEME 2006
  6. Schedule THE SCHEDULE TO THE SCHEMESchedule THE SCHEDULE TO THE SCHEME
  7. 1Paragraph 1
  8. 2Paragraph 2

1

This Instrument may be cited as The Stockton-on-Tees Borough Council North Shore Development (North Shore Footbridge) Scheme 2006 Confirmation Instrument 2006 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2

The Stockton-on-Tees Borough Council North Shore Development (North Shore Footbridge) Scheme 2006 (“the Scheme”) is hereby confirmed without modifications.

3

The Scheme as confirmed is set out in the Schedule hereto (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of Stockton-on-Tees Borough Council, Municipal Buildings, Church Road, Stockton-on-Tees, TS18 1LD.

Signature

Signed by authority of the Secretary of State for Transport

J. Blackie

Regional Director Government Office for the North East

7th September 2006

Schedule THETHE STOCKTON-ON-TEES BOROUGH COUNCIL NORTH SHORE DEVELOPMENT (NORTH SHORE FOOTBRIDGE) SCHEME 2006

The Council of the Borough of Stockton-on-Tees (hereinafter referred to as “the Council” make this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and all powers enabling them in that behalf.

1

The Council are authorised to construct over the navigable waters of the River Tees upstream of the Tees Barage the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the South Bank of the River Tees from Grid Point Reference 445396.059-518973.193 to the North Bank of the River Tees Grid Point Reference 445427.520-519150.422.

2

The Scheme may be cited as The Stockton-on-Tees Borough Council North Shore Development (North Shore Footbridge) Scheme 2006.

  • Given under the common seal of the Council on the 9th day of May 2006

  • EXECUTED as a Deed by

  • Affixing THE COMMON

  • SEAL OF THE COUNCIL OF

  • THE BOROUGH OF

  • STOCKTON-ON-TEES

  • in the presence of

  • Authorised Officer

Schedule THE SCHEDULE TO THE SCHEME

The location and general design of the footbridge are shown on the Plan being Job No. 114 Drawing No. 2000 Rev 2 and marked “The Stockton-on-Tees Borough Council North Shore Development (North Shore Footbridge) Scheme 2006” (hereinafter referred to as “the Plan”).

1

The North Shore footbridge forms an important footpath-cycleway link between the proposed North Shore Development and the existing Teesdale site on the South Bank of the River Tees.

2

The specification of the Structure is as follows: