Part 1 DOCUMENTS AND PLANSI1

England, Wales and Scotland

(1) Document name(2) Document reference(3) Revision number(4) Date
AMS7.17(A)2May 2025
Book of reference4.1(A)2May 2025
Crown land plans2.21June 2024
Design principles7.5(C)4April 2025
Environmental statement5.1-5.41June 2024
Land plans2.11June 2024
Outline battery safety management plan7.16(A) F12 April 2025
Outline construction environmental management plan7.8(A)2December 2024
Outline construction traffic management plan7.9(C)4January 2025
Outline decommissioning environmental management plan7.121June 2024
Outline decommissioning traffic management plan7.13(C)4January 2025
Outline landscape and ecological management plan7.10(B)3January 2025
Outline operational management plan7.11(A)2December 2024
Outline operational surface water drainage strategy F2(excluding appendices A, B, C and D) 7.14(C)4March 2025
F3outline operational surface water drainage strategy, appendices A, B, C and D 7.14(B)3January 2025
Outline rights of way and access strategy7.15(A)2December 2024
Streets, rights of way and access plans2.51June 2024
Traffic regulations measures plans2.41June 2024
Vegetation removal plan2.81June 2024
Works plans2.3(B)3December 2024

Annotations

Textual amendments

F1

Word in Sch. 14 Pt. 1 substituted (6.2.2026) by The Stonestreet Green Solar (Correction) Order 2026 (S.I. 2026/131), art. 1, Sch.

F2

Words in Sch. 14 Pt. 1 inserted (6.2.2026) by The Stonestreet Green Solar (Correction) Order 2026 (S.I. 2026/131), art. 1, Sch.

F3

Words in Sch. 14 Pt. 1 inserted (6.2.2026) by The Stonestreet Green Solar (Correction) Order 2026 (S.I. 2026/131), art. 1, Sch.

Commencement

I1

Sch. 14 Pt. 1 in force at 13.11.2025, see art. 1