Regulation 11 Validity of actions of panel
The validity of anything done by a panel is not affected by a failure by a panel or a constituent local planning authority to comply with any obligation or requirement imposed on them (as the case may be) by—
(b)
regulation 6 (duty to review composition requirements);
(c)
regulation 7 (reporting requirements);
(d)
regulation 8 (notification of failure to comply with reporting requirements);
(e)
regulation 9(3) (powers in the event of failure to comply).