The Submarine Pipe-lines (Designated Owners) (No. 4) Order 1992

S.I. 1992/521 · Made 2 March 1992

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

PIPE-LINES

Made 2nd March 1992

Coming into force— 24th March 1992

The Secretary of State, in exercise of the powers conferred on him by section 33(3) of the Petroleum and Submarine Pipe-lines Act 1975f1 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and after giving that person affected an opportunity of being heard with respect to the matter, hereby makes the following Order:—

Annotations to the whole text

Footnotes

f1

1975 c. 74.

Contents

  1. 1Article 1
  2. 2Article 2
  3. Signature
  4. Schedule
  5. IDESCRIPTION OF PIPE-LINES
  6. IIDESCRIPTION OF PIPE-LINE
  7. Explanatory note

1

This Order may be cited as the Submarine Pipe-lines (Designated Owners) (No. 4) Order 1992 and shall come into force on 24th March 1992.

2

For the purposes of Part III of the Act, B.P. Exploration Operating Company Limited whose registered office is situated at D'Arcy House, 146 Queen Victoria Street, London EC4V 4BY, is hereby designated as the owner of the pipe-lines described in Part I of the Schedule hereto and the owner of so much of the pipe-line described in Part II of the Schedule as is a controlled pipe-line.

Signature

Colin Moynihan

Parliamentary Under Secretary of State

Department of Energy

2nd March 1992

IDESCRIPTION OF PIPE-LINES

(1)(2)(3)(4)
Route of pipe-lines
FromToNominal diameter of pipes in inchesDate brought into use
Cleeton PlatformRavenspurn A Platform224.9.89
Ravenspurn A PlatformCleeton Platform1624.9.89
Ravenspurn B PlatformSubsea tee junction on pipe-line from Ravenspurn A Platform to Cleeton Platform1224.9.89
Ravenspurn C PlatformSubsea tee junction on pipe-line from Ravenspurn A Platform to Cleeton Platform1224.9.89
Subsea tee junction on pipe-line from Cleeton Platform to Ravenspurn A PlatformRavenspurn B Platform224.9.89
Subsea tee junction on pipe-line from Cleeton Platform to Ravenspurn A PlatformRavenspurn C Platform224.9.89

IIDESCRIPTION OF PIPE-LINE

(1)(2)(3)(4)
Route of pipe-line
FromToNominal diameter of pipe in inchesDate brought into use
Cleeton PlatformBP Exploration Operating Company Limited Terminal at Dimlington3624.9.89

Explanatory note

(This note is not part of the Order)

This Order designates BP Exploration Operating Company Limited as the owner of the pipe-lines described in Parts I and II of the Schedule. In the case of the pipe-line specified in Part II, the designation applies only to those parts which are in controlled waters, that is the territorial sea and areas designated under the Continental Shelf Act1964 (c. 29).

The pipe-lines referred to in Part I of the Schedule lie above and between the Cleeton and Ravenspurn gasfields, situated to the east of the coast of Humberside. The pipe-line referred to in Part II lies between the Cleeton gasfield and the natural gas terminal at Dimlington in the County of Humberside.