The Submarine Pipe-lines (Designated Owners) (No. 7) Order 1989
S.I. 1989/755 · Made 28 April 1989
PIPE-LINES
Made 28th April 1989
Coming into force 1st June 1989
The Secretary of State, in exercise of the powers conferred on him by section 33(3) of the Petroleum and Submarine Pipe-lines Act 1975f1 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and after giving those persons affected an opportunity of being heard with respect to the matter, hereby makes the following Order:–
Annotations to the whole text
Footnotes
- f1
Contents
- 1Article 1
- 2Article 2
- Signature
- Schedule
- IDESIGNATED OWNERS
- IIDESCRIPTION OF PIPE-LINE
- Explanatory note
1
This Order may be cited as the Submarine Pipe-lines (Designated Owners) (No. 7) Order 1989 and shall come into force on 1st June 1989.
2
For the purposes of Part III of the Act, each person specified in Part I of the Schedule hereto is hereby designated as the owner of the pipe-line described in Part II of the Schedule hereto.
Signature
Peter Morrison
Minister of State,
Department of Energy
28th April 1989
IDESIGNATED OWNERS
-
Esso Exploration and Production UK Limited, whose registered office is at Esso House, Victoria Street, London SW1E 5JW.
-
Shell U.K. Limited, whose registered office is at Shell-Mex House, Strand, London WC2R 0DX.
IIDESCRIPTION OF PIPE-LINE
| (1) | (2) | (3) | (4) |
|---|---|---|---|
| Route of Pipe-line | Nominal diameter in inches | Year brought into use | |
| From | To | ||
| Brent A Platform | Subsea Tee on pipe-line from Brent B Platform to St. Fergus Terminal | 24 | 1982 |
Explanatory note
(This note is not part of the Order)
This Order designates the companies specified in Part I of the Schedule as owners of the pipe-line described in Part II of the Schedule. The pipe-line lies above the Brent oilfield, north-east of the Shetland Islands.