The Submarine Pipe-lines (Designated Owners) (No.5) Order 1989
S.I. 1989/753 · Made 28 April 1989
PIPE-LINES
Made 28th April 1989
Coming into force 1st June 1989
The Secretary of State, in exercise of the powers conferred on him by section 33(3) of the Petroleum and Submarine Pipe-lines Act 1975f1 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and after giving those persons affected an opportunity of being heard with respect to the matter, hereby makes the following Order:–
Annotations to the whole text
Footnotes
- f1
Contents
- 1Article 1
- 2Article 2
- Signature
- Schedule
- IDESIGNATED OWNERS
- IIDESCRIPTION OF PIPE-LINE
- Explanatory note
1
This Order may be cited as the Submarine Pipe-lines (Designated Owners) (No.5) Order 1989 and shall come into force on 1st June 1989.
2
For the purposes of Part III of the Act, each person specified in Part I of the Schedule hereto is hereby designated as the owner of the pipe-line described in Part II of the Schedule hereto.
Signature
Peter Morrison
Minister of State,
Department of Energy
28th April 1989
IDESIGNATED OWNERS
-
Britoil plc, whose registered office is at 301 St. Vincent Street, Glasgow G2 5DD.
-
Deminex UK Oil and Gas Ltd., whose registered office is at Bowater House, 68 Knightsbridge, London SW1X 7LD.
-
Hunt Overseas Oil Inc., whose principal place of business in the United Kingdom is at Meadows House, 20/22 Queen Street, London W1X 8AR.
-
Kerr-McGee Oil (UK) plc, whose registered office is at Blackfriars House, 19 New Bridge Street, London EC4V 6BY.
-
LASMO North Sea plc, whose registered office is at Bastion House, 140 London Wall, London EC2Y 5DN.
IIDESCRIPTION OF PIPE-LINE
| (1) | (2) | (3) | (4) |
|---|---|---|---|
| Route of pipe-line From | To | Nominal diameter in inches | Date brought into use |
| Beatrice AA Platform | Beatrice CC Platform | 11 | 4.2.85 |
Explanatory note
(This note is not part of the Order)
This Order designates the companies listed in Part I of the Schedule as owners of the pipe-line described in Part II of the Schedule. The pipe-line lies between installations situated above the Beatrice oilfield, east of the Highland Region of Scotland.