The Submarine Pipe-lines (Designated Owners) Order 1988

S.I. 1988/634 · Made 23 March 1988

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

PIPE-LINES

Made 23rd March 1988

Coming into force 1st May 1988

The Secretary of State, in exercise of the powers conferred on him by section 33(3) of the Petroleum and Submarine Pipe-lines Act 1975f1 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and after giving those persons affected an opportunity of being heard with respect to the matter, hereby makes the following Order:—

Annotations to the whole text

Footnotes

f1

1975 c. 74.

Contents

  1. 1Article 1
  2. 2Article 2
  3. Signature
  4. Schedule 1PIPE-LINES OF BRITISH GAS P.L.C.
  5. Schedule 2PIPE-LINES OF HYDROCARBONS GREAT BRITAIN LIMITED
  6. Explanatory note

1

This Order may be cited as the Submarine Pipe-lines (Designated Owners) Order 1988 and shall come into force on 1st May 1988.

2

For the purposes of Part III of the Act—

(a)

British Gas Public Limited Company, whose registered office is situated at Rivermill House, 152 Grosvenor Road, London, SW1V 3JL, is designated as the owner of so much of the pipe-lines specified in Part I of Schedule 1 hereto as are controlled pipe-lines and the owner of the controlled pipe-line specified in Part II of that Schedule; and

(b)

Hydrocarbons Great Britain Limited, whose registered office is situated at Rivermill House, 152 Grosvenor Road, London, SW1V 3JL, is designated as the owner of so much of the pipe-line specified in Part I of Schedule 2 hereto as is a controlled pipe-line and the owner of the controlled pipe-lines specified in Part II of that Schedule.

Signature

Peter Morrison

Minister of State,

Department of Energy

23rd March 1988

Schedule 1PIPE-LINES OF BRITISH GAS P.L.C.

Route of the Pipe-lines From

To

External diameter in inches

Date brought into use

PART I
Rough AP PlatformEasington Terminal1625.12.75
Rough BP PlatformEasington Terminal3628.11.84
PART II
Rough AP PlatformRough BP Platform1828.11.84

Schedule 2PIPE-LINES OF HYDROCARBONS GREAT BRITAIN LIMITED

Route of the Pipe-lines From

To

External diameter in inches

Date brought into use

PART I
Morecambe CPP1 PlatformWestfield Point Terminal3618.12.84
PART II
Morecambe CPP1 PlatformMorecambe DP3 Platform218.12.84
Morecambe DP3 PlatformMorecambe CPP1 Platform2418.12.84
Morecambe CPP1 PlatformMorecambe DP4 Platform224.02.86
Morecambe DP4 PlatformMorecambe CPP1 Platform2424.02.86

Explanatory note

(This note is not part of the Order)

This Order designates British Gas p.l.c. and Hydrocarbons Great Britain Limited as the owners of the pipe-lines described in Schedules 1 and 2 respectively. In the case of pipe-lines with a landfall the designation applies only to those parts which are in controlled waters, that is, the territorial sea and areas designated under the Continental Shelf Act 1964 (c. 29).