The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2014 Confirmation Instrument 2015 in England

S.I. 2015/31 · Made 12 January 2015

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Highways, England

Made 12th January 2015

Coming into force in accordance with section 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980f1, and now vested in the Secretary of Statef2:

Annotations to the whole text

Footnotes

f1

1980 c.66

f2

S.I. 1981/238

Contents

  1. 1Section 1
  2. 2Section 2
  3. 3Section 3
  4. Signature
  5. Schedule THESchedule THE
  6. Schedule THE SCHEDULE TO THE SCHEMESchedule THE SCHEDULE TO THE SCHEME
  7. Explanatory note

1

This Instrument may be cited as “The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2014 Confirmation Instrument 2015” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2

The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2014 (“the Scheme”) is hereby confirmed.

3

The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA and at the offices of the Council of Sunderland City Council, Civic Centre, Sunderland, SR2 7DN.

Signature

Signed by authority of the Secretary of State for Transport

Cathy Miller

A Senior Civil Servant in the Department for Transport

12th January 2015

Schedule THE

The Council of the City of Sunderland (hereinafter referred to as “the Council”) make this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf—

1

The Council are authorised to construct over the navigable waters of the River Wear the Bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct/improve between the Wessington Way/Castletown Way roundabout and the Woodbine Terrace/Pallion New Road junction in the City of Sunderland.

2

This Scheme may be cited as The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2014.

Given under the seal of the Council

on the 11th day of July 2014.

THE SEAL of THE COUNCIL OF THE )

CITY OF SUNDERLAND was hereunto )

affixed in the presence of:- )

Authorised Signatory

Schedule THE SCHEDULE TO THE SCHEME

The location and general design of the Bridge are shown on the plans numbered NWC/D/SCC/07/GEN/800042 and NWC/D/SCC/07/GEN/800043 marked “Sunderland Strategic Transport Corridor – New Wear Bridge”.

Explanatory note

(This note is not part of the Instrument)

This instrument confirms a scheme to construct over the navigable waters of the River Wear a Bridge as part of the highway which they are proposing to construct/improve between the Wessington Way/Castletown Way roundabout and the Woodbine Terrace/Pallion New Road junction in the City of Sunderland.