Part 7 Annex VII: Technical files
| A. | Technical file for machinery | |||||||||
| This part describes the procedure for compiling a technical file. The technical file must demonstrate that the machinery complies with the provisions of | ||||||||||
| 1. | The technical file shall comprise the following: | |||||||||
| (a) | a construction file including: | |||||||||
| a general description of the machinery, | ||||||||||
| the overall drawing of the machinery and drawings of the control circuits, as well as the pertinent descriptions and explanations necessary for understanding the operation of the machinery, | ||||||||||
| full detailed drawings, accompanied by any calculation notes, test results, certificates, etc., required to check the conformity of the machinery with the essential health and safety requirements, | ||||||||||
| the documentation on risk assessment demonstrating the procedure followed, including: | ||||||||||
| (i) | a list of the essential health and safety requirements which apply to the machinery, | |||||||||
| (ii) | the description of the protective measures implemented to eliminate identified hazards or to reduce risks and, when appropriate, the indication of the residual risks associated with the machinery, | |||||||||
| the standards and other technical specifications used, indicating the essential health and safety requirements covered by these standards, | ||||||||||
| any technical report giving the results of the tests carried out either by the manufacturer or by a body chosen by the responsible person, | ||||||||||
| a copy of the instructions for the machinery, | ||||||||||
| where appropriate, the declaration of incorporation for included partly completed machinery and the relevant assembly instructions for such machinery, | ||||||||||
| where appropriate, copies of the | ||||||||||
| a copy of the | ||||||||||
| (b) | for series manufacture, the internal measures that will be implemented to ensure that the machinery remains in conformity with the provisions of | |||||||||
| The manufacturer must carry out necessary research and tests on components, fittings or the completed machinery to determine whether by its design or construction it is capable of being assembled and put into service safely. The relevant reports and results shall be included in the technical file. | ||||||||||
| 2. | The technical file referred to in point 1 of this Annex must be made available to the enforcement authorities | |||||||||
| The technical file does not have to be located in the | ||||||||||
| The technical file does not have to include detailed plans or any other specific information as regards the sub-assemblies used for the manufacture of the machinery unless a knowledge of them is essential for verification of conformity with the essential health and safety requirements. | ||||||||||
| 3. | Failure to present the technical file in response to a duly reasoned request by the | |||||||||
| B. | Relevant technical documentation for partly completed machinery | |||||||||
| This part describes the procedure for compiling relevant technical documentation. The documentation must show which provisions of | ||||||||||
| Relevant technical documentation shall comprise the following: | ||||||||||
| (a) | a construction file including: | |||||||||
| the overall drawing of the partly completed machinery and drawings of the control circuits, | ||||||||||
| full detailed drawings, accompanied by any calculation notes, test results, certificates, etc., required to check the conformity of the partly completed machinery with the applied essential health and safety requirements, | ||||||||||
| the risk assessment documentation showing the procedure followed, including: | ||||||||||
| (i) | a list of the essential health and safety requirements applied and fulfilled, | |||||||||
| (ii) | the description of the protective measures implemented to eliminate identified hazards or to reduce risks and, where appropriate, the indication of the residual risks, | |||||||||
| (iii) | the standards and other technical specifications used, indicating the essential health and safety requirements covered by these standards, | |||||||||
| (iv) | any technical report giving the results of the tests carried out either by the manufacturer or by a body chosen by the responsible person, | |||||||||
| (v) | a copy of the assembly instructions for the partly completed machinery; | |||||||||
| (b) | for series manufacture, the internal measures that will be implemented to ensure that the partly completed machinery remains in conformity with the essential health and safety requirements applied. | |||||||||
| The manufacturer must carry out necessary research and tests on components, fittings or the partly completed machinery to determine whether by its design or construction it is capable of being assembled and used safely. The relevant reports and results shall be included in the technical file. | ||||||||||
| The relevant technical documentation must be available for at least 10 years following the date of manufacture of the partly completed machinery or, in the case of series manufacture, of the last unit produced, and on request presented to an enforcement authority | ||||||||||
| Failure to present the relevant technical documentation in response to a duly reasoned request by an enforcement authority | ||||||||||
Annotations
Textual amendments
- F1
Words in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(a)(i) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Word in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(a)(ii) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Word in Sch. 2 Pt. 7 omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(b) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F4
Words in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(c) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F5
Words in Sch. 2 Pt. 7 omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(d)(i) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F6
Words in Sch. 2 Pt. 7 substituted (N.I.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment) (Northern Ireland) (EU Exit) Regulations 2020 (S.I. 2020/1112), reg. 1(b), Sch. 4 para. 7(c)(i)
- F7
Words in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(d)(ii)(aa) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F8
Words in Sch. 2 Pt. 7 substituted (N.I.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment) (Northern Ireland) (EU Exit) Regulations 2020 (S.I. 2020/1112), reg. 1(b), Sch. 4 para. 7(c)(ii)
- F9
Word in Sch. 2 Pt. 7 omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(d)(ii)(bb) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F10
Words in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(2)(e) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F11
Words in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(3)(a)(i) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F12
Word in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(3)(a)(ii) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F13
Words in Sch. 2 Pt. 7 omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(3)(b)(ii) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F14
Words in Sch. 2 Pt. 7 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 12 para. 27(3)(b)(i) (with Sch. 12 para. 22) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)