Article 3 Power to make works

Original text. Later amendments are not shown.

(1)

Subject to the provisions of this Order, the Company may, in the lines and situations shown on sheet 2 of the deposited maps and according to the levels shown on sheet 3 of the deposited maps make and maintain the following works in the district of Teignbridge in the County of Devon:

A new quay comprising a reclamation of the foreshore of the river Teign of which the seaward face commences by a junction with the eastern quay wall of the existing No. 1 Dock at reference point 293748: 072871, then proceeds in a westerly direction for a distance of 300 metres to reference point 293446: 072899, then proceeds in a northerly direction for a distance of 5 metres to reference point 293446: 072904, then in a westerly direction for a distance of 20 metres to reference point 293427: 072908 and then in a northerly direction for a distance of 13 metres and terminates at reference point 293421: 072921 by a connection with the existing revetment, including an infilling of No. 1 Dock.

(2)

In connection with the construction of the western end of the new quay the Company may relocate the existing public slipway.

(3)

The Company may from time to time within the limits of deviation erect, construct and maintain all such works, buildings, conveniences, appliances and apparatus as it from time to time deems necessary or convenient for the purposes of or in connection with or incidental to, the construction and maintenance of the new quay or the accommodation of vessels or the carrying out of dock operations at or on the new quay.

(4)

The Company may, within the limits of deviation, from time to time alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the works.