Schedule Amendments to the 2014 Order
| Provision to be amended | Text to be omitted | Text to be substituted |
|---|---|---|
| Article 6(1), in the words before sub-paragraph (a) | “16b and 20” | “16b, 20 and the tunnel comprised in Work No.27(v)” |
| Schedule 1, Part 1, under the heading “BECKTON SEWAGE TREATMENT WORKS”, “Work No.27”, paragraph (iii) | “9 metres and which has a depth (to invert level) of 32 metres” | “up to 10.5 metres and which has a depth (to invert level) of up to 24 metres” |
| Schedule 1, Part 1, under the heading “BECKTON SEWAGE TREATMENT WORKS”, “Work No.27”, paragraph (iv) | “7 metres (which extends 3 metres above the proposed ground level) and which has a depth (to invert level) of 31 metres” | “up to 7 metres (which extends 3 metres above the proposed ground level) and which has a depth (to invert level) of up to 23 metres” |
| Schedule 2, Part 1 (works plans), Table 1, column 3 (drawing number) | “DCO-WP-000- ZZZZZ-010057 – rev 1” | “DCO-WP-000-ZZZZZ-010057 – rev 2” |
| “DCO-WP-000-ZZZZZ-010058” | “DCO-WP-000-ZZZZZ-0100058 – rev 1” | |
| “DCO-WP-000-ZZZZ-0100059 – rev 1” | “DCO-WP-000-ZZZZZ-010059 – rev 2” | |
| “DCO-WP-000-ZZZZZ-010060 – rev 1” | “DCO-WP-000-ZZZZZ-010060 – rev 2” | |
| Schedule 2, Part 4 (approved plans), Table 1, column 3 (drawing number) | “DCO-PP-27X- BESTW- 280003 – rev 1” | “DCO-PP-27X-BESTW- 280003 – rev 2”f1 |
Annotations
Footnotes
- f1
-
This plan and those referred to above may be inspected free of charge during working hours at the offices of London Borough of Newham, Newham Dockside, 1000 Dockside Road, London, E16 2QU.