OpenLegislation

Paragraph 13 Mass grading

Original text. Later amendments are not shown.

(1)

No mass grading may begin until the site controller has submitted to the Secretary of State for approval a grading plan for the part of the Order land where it is proposed to carry out that mass grading, and the Secretary of State has endorsed the plan.

(2)

A grading plan must include the following—

(a)

an OS plan showing the location where the mass grading is proposed to take place;

(b)

details of the proposed mass grading;

(c)

a topographic map showing—

(i)

the existing elevation and gradient for the part of the Order land where the mass grading is to be carried out and the proposed modifications to the topography of the land and the intended elevation of the land after grading;

(ii)

a plan of the areas from which earth will be excavated and to which it will be added to achieve the desired elevations.