The Town and Country Planning (Entertainment Resort Complex, Bedford) Special Development (No. 2) Order 2025
S.I. 2025/1322 · Made 15 December 2025
This Statutory Instrument has been made in consequence of a defect in S.I. 2025/1315 and is being issued free of charge to all known recipients of that Statutory Instrument.
Town And Country Planning, England
Made 15th December 2025
Laid before Parliament 16th December 2025
Coming into force in accordance with article 1(2)
The Secretary of State for Housing, Communities and Local Government makes this Order in exercise of the powers conferred by sections 59(1), (2)(a) and (3)(b), 60(1), (1A) and (2A) and 333(7) of the Town and Country Planning Act 1990f1.
Annotations to the whole text
Footnotes
- f1
-
1990 c. 8. Section 60 was amended by section 4(1) of the Growth and Infrastructure Act 2013 (c. 27) and section 152(1) of the Housing and Planning Act 2016 (c. 22). There are other amending instruments but none is relevant.
Contents
- 1Citation, commencement, extent, application and revocation
- 2Interpretation
- 3Other planning permissions
- 4Grant of planning permission
- 5Conditions and limitations
- 6Endorsement of submission documents
- 7Modification of reference documents, controlling documents and endorsement conditions
- 8Publication of documents
- Signature
- Schedule 1Reference documents
- Schedule 2: Classes of development permitted
- 1Visitor entertainment and hospitality facilities
- 2Support for provision and operation of visitor entertainment and hospitality facilities
- 3Rail-related development
- 4Utilities and services
- 5Walking, wheeling and cycling routes
- 6Roads and associated infrastructure
- 7Vehicle-related facilities
- 8Security and reception
- 9Landscaping and environmental measures, miscellaneous features, facilities and amenities
- Schedule 3: Conditions and limitations
- Part 1: Preliminary
- 1Interpretation of Schedule
- 2Alteration of zonal boundaries; ticketed area plan
- Part 2: Site controller
- 3Designation of site controller and appointment of principal representative
- 4Core controls
- 5Experience and capability
- Part 3: Habitat creation, enhancement and maintenance
- 6Specified habitats: general
- 7Habitat location plan
- 8Habitat creation and enhancement plans
- 9Landscape and ecology management plans
- 10Dark corridors for bats
- Part 4: Construction work: general management
- 11Time when development must be begun
- 12Construction environmental management plan
- 13Mass grading
- 14Land remediation
- 15Archaeological mitigation
- 16Construction traffic management scheme
- 17Broadmead Road
- 18Broadmead Road level crossing
- Part 5: Temporary accommodation for construction workers
- 19Interpretation of Part 5
- 20Accommodation monitoring reports
- 21Exceedances and accommodation management plans
- 22Construction worker accommodation
- Part 6: Height controls
- 23Height controls: general
- 24Height controls to secure an articulated skyline
- Part 7: Approval of masterplans and detailed designs
- 25Interpretation of Part 7
- 26Requirement for masterplan or detailed design approval
- 27Masterplans
- 28Detailed designs: class 3 and class 6 authorised works
- 29Detailed designs: other classes of authorised works
- 30Lake Zone (proximity to liquefied natural gas facility)
- Part 8: Reference design standards
- 31Reference design standards applicable to all parts of the Order land
- 32Reference design standards applicable only to the Core Zone
- 33Reference design standards applicable only to the East Gateway Zone
- 34Reference design standards applicable only to the Lake Zone
- Part 9: Location of certain authorised works
- 35Primary access points
- 36Entertainment resort complex
- 37Transport related development
- 38Petrol filling or service station
- 39Camp sites
- 40Conference and convention facilities
- 41Sports venues with outdoor playing fields
- 42Class 4 authorised works
- Part 10: Authorised works and authorised development: other specific restrictions and requirements
- 43Impact of authorised works on natural light in certain dwellings
- 44Kempston Hardwick moated site
- 45Veteran tree
- 46ERC expansion areas
- 47Means of enclosure with a height of more than 5.4 metres AGL
- 48Battery energy storage system
- 49Limits on extent of highway works
- 50Limits on extent of railway development
- 51Limits on capacity, extent or use of certain energy and water infrastructure
- 52Floorspace
- 53Vehicle parking
- 54Leadership in Energy and Environmental Design
- 55Carbon management
- Part 11: Water and drainage
- 56Riparian protection zone
- 57Flood risk
- 58Storage capacity
- 59Water conservation and supplies of non-potable water
- 60Culverts
- 61Outfalls
- 62Road crossing over Elstow Brook
- 63Runoff
- 64Sustainable drainage
- 65Sustainable drainage systems: management and maintenance
- 66Foul drainage
- 67Water supplies
- 68Kempston Hardwick Clay Pits (North)
- Part 12: Grand Opening and Soft Opening Period: further preconditions
- 69Core capacity and features of ERC
- 70Soft Opening Period and security and emergency management
- 71Public access
- 72Manor Road level crossing
- 73Public rights of way
- 74Wixams station (bus replacement service)
- 75Travel plan
- Part 13: Preconditions to occupation of certain authorised works
- 76Restrictions on occupation before Grand Opening
- 77Public roads in Lake Zone
- 78Active travel
- Part 14: Transport
- 79Traffic monitoring and management
- 80Milton Keynes shuttle bus
- 81Wixams shuttle bus
- Part 15: Fireworks, pyrotechnics and other displays
- 82Firework displays
- 83Drone shows
- 84Pyrotechnic and laser effects
- Part 16: Noise and vibration
- 85Noise and vibration
- 86Seasonal events and special events
- 87Hotels
- 881 and 2 Vine Cottages
- Part 17: Miscellaneous
- 89Opening hours
- 90Employment and skills
- Schedule 4Maximum height parameter tables
- Explanatory note