Paragraph 68 Kempston Hardwick Clay Pits (North)
Water levels in the strategic attenuation ponds comprised in the body of surface water that is identified as “Kempston Hardwick Clay Pits (North) – Disused Pits” in Image 3-1 (existing site waterbodies flood defences) in the drainage strategy must be maintained at not less than 20.50 metres AOD.