OpenLegislation

Schedule

Original text. Later amendments are not shown.

“

TABLE

12
(Category of development)(Fee payable)
I. Operations
1

The erection of dwellinghouses (other than development within category 5).

Where the application is for–
(a)

outline planning permission, £77 for each 0.1 hectare of the site area, subject to a maximum of £1,925; or for one dwellinghouse, £77;

(b)

Other than outline planning permission, £77 for each dwellinghouse to be created by the development, subject to a maximum of £3,850.

2

The erection of buildings (other than buildings coming within category 1, 3 or 5).

Where the application is for–
(a)

outline planning permission, £77 for each 0.1 hectare of the site area, subject to a maximum of £1,925;

(b)

other than outline planning permission–

(i)

where no floor space is to be created by the development, £39;

(ii)

where the area of gross floor space to be created by the development does not exceed 40 square metres, £39;

(iii)

where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £77; and

(iv)

where the area of gross floor space to be created by the development exceeds 75 square metres, £77 for each 75 square metres, subject to a maximum of £3,850.

3

The erection on land used for the purposes of agriculture, of those buildings excluded by virtue of subparagraph (c) in paragraph (1) of class V in Schedule 1 to the General Development Order from that class.

(a)

Where the application is for outline planning permission, £77 for each 0.1 hectare of the site area, subject to a maximum of £1,925

(b)

In all other cases

(i)

where the area of gross floor space to be created by the development does not exceed 465 square metres, nil;

(ii)

where the area of gross floor space to be created by the development exceeds 465 square metres but does not exceed 540 square metres, £77;

(iii)

where the area of gross floor space to be created by the development exceeds 540 square metres, £77 for the first 540 square metres and £77 for each 75 square metres in excess of that figure subject to maximum of £3,850.

4

The erection, alteration or replacement of plant or machinery.

£77 for each 0.1 hectare of the site area, subject to a maximum of £3,850.
5

The enlargement, improvement or other alteration of existing dwellinghouses.

(a)

Where the application relates to one dwellinghouse, £39;

(b)

where the application relates to 2 or more dwellinghouses, £77.

6
(a)

The carrying out of operations, including the erection of a building, within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such;

(b)

the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or

(c)

the construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.

£39
7

The carrying out of any operations connected with exploratory drilling for oil or natural gas.

£77 for each 0.1 hectare of the site area, subject to a maximum of £5,775.
8

The carrying out of any operations not within categories 1 to 7.

In the case of operations for–
(a)

the winning and working of minerals, £39 for each 0.1 hectare of the site area, subject to a maximum of £5,850;

(b)

the winning and working of peat, £39 for each hectare of the site area, subject to a maximum of £585;

(c)

any other purpose, £39 for each 0.1 hectare of the site area, subject to a maximum of £390.

II. Uses of Land
9

The change of use of a building to use as one or more separate dwellinghouses.

£77 for each additional dwellinghouse to be created by the development, subject to a maximum of £3,850.
10
(a)

The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land; or

(b)

the use of land for the storage of minerals in the open.

£39 for each 0.1 hectare of the site area, subject to a maximum of £5,850.
11

The making of a material change in the use of a building or land, other than a material change of use within category 9 or 10.

£77.
12

The continuance of a use of land, or the retention of buildings or works on land, without compliance with a condition subject to which a previous planning permission has been granted, including a condition requiring the discontinuance of the use or the removal of the building or works at the end of a specified period.

£39.

”