Article 6 Amendment of paragraph P of Part 14 (interpretation of Part 14)I1
England and Wales
In Part 14 (renewable energy), in paragraph P (interpretation of Part 14), in the definition of “MCS Planning Standards”—
for “(being MCS 007)” substitute “(being MCS 020 a) - Air Source Heat Pump Sound Calculation (For Permitted Development Installations))”f1;
for “(being MCS 006)” substitute “(being MCS 020 b) - Wind Turbine Sound Calculation (For Permitted Development Installations))”f2.
Annotations
Commencement
- I1
Art. 6 in force at 29.5.2025, see art. 1(2)
Footnotes
- f1
-
Issue 1.1 dated 14th April 2025. An electronic copy can be found at: https://mcscertified.com/wp-content/uploads/2025/04/MCS-020-a-Issue-1.1-Final.pdf. A copy of the MCS Planning Standards may be inspected at the Department of Energy Security and Net Zero, 55 Whitehall, London SW1A 2HP.
- f2
-
Issue 1.0 dated 20th March 2025. An electronic copy can be found at: https://mcscertified.com/wp-content/uploads/2025/03/MCS-020-b-Issue-1.0-Final.pdf. A copy of the MCS Planning Standards may be inspected at the Department of Energy Security and Net Zero, 55 Whitehall, London SW1A 2HP.