Paragraph J.1 Development not permitted
Development is not permitted by Class J if—
it consists of the drilling of boreholes for petroleum exploration;
any operation would be carried out within 50 metres of any part of an occupied residential building or a building occupied as a hospital or school;
any operation would be carried out within a National Park, an area of outstanding national beauty, a site of archaeological interest, a site of special scientific interest or the Broads;
any explosive charge of more than 1 kilogram would be used;
any excavation referred to in Class J(c) would exceed 10 metres in depth or 12 square metres in surface area;
in the case described in Class J(c) more than 10 excavations would, as a result, be made within any area of 1 hectare within the land during any period of 24 months; or
any structure assembled or provided would exceed F215 metres in height, or, where the structure would be within 3 kilometres of the perimeter of an aerodrome, 3 metres in height.
Annotations
Textual amendments
- F1
Sch. 2 Pt. 17 Class J para. J.1(c) substituted (6.4.2016) by The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2016 (S.I. 2016/332), arts. 1, 14(a)(i) (with art. 15(1))
- F2
Word in Sch. 2 Pt. 17 Class J para. J.1(g) substituted (6.4.2016) by The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2016 (S.I. 2016/332), arts. 1, 14(a)(ii)