Paragraph J.2 Conditions
Development is permitted by Class J subject to the following conditions—
(a)
where there is a risk of groundwater contamination the hard surface must not be made of porous materials; and
(b)
in all other cases, either—
(i)
the hard surface is made of porous materials, or
(ii)
provision is made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the industrial building or warehouse.