Paragraph F.1 Development not permittedF1F2
Development is not permitted by Class F if—
the capacity of the system that the flue would serve exceeds 45 kilowatts thermal;
the height of the flue would exceed either—
the highest part of the roof by 1 metre or more, or
the height of an existing flue which is being replaced,
whichever is the highest;
the installation of the flue would result in the installation on the same building of more than one flue forming part of either a biomass heating system or a combined heat and power system;
the flue would be installed within the curtilage of a listed building;
the flue would be installed on a site designated as a scheduled monument; or
in the case of a building on article 1(5) land or on land within a World Heritage Site, the flue would be installed on a wall or roof slope which fronts a highway.
Annotations
Textual amendments
- F1
Order revoked (E.) (15.4.2015) by The Town and Country Planning (General Permitted Development) (England) Order 2015 (S.I. 2015/596), art. 1(1), Sch. 4 para. 1 (with arts. 1(2), 8(2)(3))
- F2
Sch. 2 Pt. 43 inserted (W.) (5.10.2012) by The Town and Country Planning (General Permitted Development) (Amendment) (Wales) (No. 2) Order 2012 (S.I. 2012/2318), arts. 1(1), 4, Sch.
Notes on Part 43
Textual amendments
- F3
Sch. 2 Pt. 43 heading substituted (W.) (1.4.2019) by The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2019 (S.I. 2019/330), arts. 1(2), 7(2)