Paragraph 53

Scotland

(1)

Development on any land during a period not exceeding 28 consecutive days consisting of—

(a)

the drilling of boreholes;

(b)

the carrying out of seismic surveys; or

(c)

the making of other excavations,

for the purpose of mineral exploration, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations.

(2)

Development is not permitted by this class if—

F1(za)

it is contrary to the requirements of the Management of Extractive Waste (Scotland) Regulations 2010;

(a)

it consists of the drilling of boreholes for petroleum exploration;

(b)

any operation would be carried out within 50 metres of any part of an occupied residential building or a building occupied as a hospital or school;

(c)

any operation would be carried out within a national scenic area or a site of archaeological or special scientific interest;

(d)

any explosive charge of more than 1 kilogram would be used;

(e)

any excavation referred to in sub-paragraph (1)(c) would exceed 10 metres in depth or 12 square metres in surface area;

(f)

in the case described in sub-paragraph (1)(c) more than 10 excavations would, as a result, be made within any area of 1 hectare within the land during any period of 24 months; or

(g)

any structure assembled or provided would exceed 12 metres in height, or, where the structure would be within 3 kilometres of the perimeter of an aerodrome, 3 metres in height.

(3)

Development is permitted by this class subject to the following conditions:—

(a)

no operations shall be carried out between 6pm and 7am;

(b)

no trees on the land shall be removed, felled, lopped or topped and no other thing shall be done on the land likely to harm or damage any trees, unless the planning authority have otherwise agreed in writing;

(c)

before any excavation (other than a borehole) is made, any topsoil and any subsoil shall be separately removed from the land to be excavated and stored separately from other excavated material and from each other;

(d)

within a period of 28 days from the cessation of operations unless the planning authority have, in a particular case, agreed otherwise in writing—

(i)

any structure permitted by this class and any waste material arising from development permitted by this class shall be removed from the land;

(ii)

any borehole shall be adequately sealed;

(iii)

any other excavation shall be filled with material from the site;

(iv)

the surface of the land on which any operations have been carried out shall be levelled and any topsoil replaced as the uppermost layer; and

(v)

the land shall, so far as is practicable, be restored to the condition it was in before the development took place, including the carrying out of any necessary seeding and replanting.

Annotations

Textual amendments

F1

Sch. 1 Pt. 15 Class 53(2)(za) inserted (1.5.2012) by The Management of Extractive Waste (Scotland) Regulations 2010 (S.S.I. 2010/60), regs. 1(2), 3(1)(c) (with regs. 4, 5)

Notes on Part 15

Textual amendments

F1

Words in Sch. 1 Pt. 15 inserted (30.6.2014) by The Town and Country Planning (General Permitted Development) (Scotland) Amendment Order 2014 (S.S.I. 2014/142), arts. 1(1), 2(12)

Commencement

I1

Sch. 1 Pt. 15 in force at 13.3.1992, see art. 1(4)