OpenLegislation

Paragraph 1 Category 3G

Development which—

(a)

involves a material change of use;

(b)

does not accord with one or more provisions of the development plan in force in the area in which the application site is situated,

(c)

where the application site is used or designed to be used wholly or mainly for the purpose of treating, keeping, processing, recovering or disposing of refuse or waste materials; and

(d)

the application site —

(i)

occupies more than 0.5 hectares; or

(ii)

contains an installation with a capacity for a throughput of more than 2,000 tonnes per annum of hazardous waste; or

(iii)

contains an installation with a capacity for a throughput of more than 20,000 tonnes per annum of waste.

Notes on Part 3

Modifications

C1

Sch. Pt. 3 modified (8.5.2017) by The Liverpool City Region Combined Authority (Functions and Amendment) Order 2017 (S.I. 2017/430), arts. 1(3), 5(6)(d), Sch. 2

C2

Sch. Pts. 2, 3 modified (1.9.2020) by The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 (S.I. 2020/757), regs. 1(1), 5