Article 5H Notification of applications for permission in principle within 10 metres of relevant railway landF1
This article applies where the development to which an application for permission in principle relates is situated within 10 metres of relevant railway land.
The local planning authority must, except where paragraph (3) applies, publicise an application for permission in principle by serving requisite notice on any infrastructure manager of relevant railway land.
Where an infrastructure manager has instructed the local planning authority in writing that they do not require notification in relation to—
a particular description of development,
a particular type of building operation, or
specified sites or geographical areas (“the instruction”),
the local planning authority is not required to notify that infrastructure manager.
The infrastructure manager may withdraw the instruction at any time by notifying the local planning authority in writing.
In this article “requisite notice” means a notice in the appropriate form as set out in Schedule 1 or in a form substantially to the same effect.
Annotations
Textual amendments
- F1
Pt. 2A inserted (1.6.2018) by The Town and Country Planning (Permission in Principle) (Amendment) Order 2017 (S.I. 2017/1309), arts. 1, 4