OpenLegislation

Regulation 37 Modification of enactmentsI1

England and Wales

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

The following provisions of the 1991 Act shall be modified as follows in relation to specified works in specified streets.

(2)

Section 58 shall have effect as if—

(a)

in subsection (3)(d) for “given notice under section 54 (advance notice of certain works) of his intention to execute street works” there were substituted “applied for a provisional advance authorisation for street works to be carried out”; and

(b)

subsections (5) to (7A) were omitted.

(3)

Section 73A(2)(a) (which, when in force, will allow street authorities to require undertakers to re-surface streets)f1 shall have effect as if for “given notice under section 54 or 55 of, or made a notification under paragraph 2(1)(d) of Schedule 3A in respect of, proposed street works”, there were substituted “submitted an application for a permit or for a provisional advance authorisation in respect of specified works in a specified street”.

(4)

Section 74f2 shall have effect as if—

(a)

there were inserted after subsection (2) the following—

“(2ZA)

For the purpose of the definition of “a reasonable period” in subsection (2), the specification in a permit (including as a result of a variation of the permit) of a period as one during which specified works may be carried out in a specified street—

(a)

does not constitute agreement to a period by the authority and the undertaker, and

(b)

is to be disregarded on an arbitration.”; and

(b)

subsections (3) and (4) were omitted.

(5)

Section 88(4) (bridges, bridge authorities and related matters)f3 shall have effect as if—

(a)

for “giving notice under section 55 (notice of starting date), or making a notification under paragraph 2(1)(d) of Schedule 3A (notification of proposed works),” there were substituted “submitting an application for a permit or for a provisional advance authorisation”, and

(b)

after “to the works”, there were inserted “or undertaking any works which are exempt from the requirement to be authorised by a permit”.

(6)

Section 89(2) (public sewers, sewer authorities and related matters)f4 shall have effect as if—

(a)

for “giving notice under section 55 (notice of starting date), or making a notification under paragraph 2(1)(d) of Schedule 3A (notification of proposed works),” there were substituted “submitting an application for a permit or for a provisional advance authorisation”, and

(b)

after “to the works”, there were inserted “or undertaking any works which are exempt from the requirement to be authorised by a permit”.

(7)

Section 93 (works affecting level crossings or tramways)f5 shall have effect as if—

(a)

in subsection (2), for the words from “give the prescribed notice” to “under subsection (1) of that section”, there were substituted “send a copy of the application for a permit or for a provisional advance authorisation to the relevant transport authority at the same time as he sends the application to the Permit Authority”;

(b)

in subsection (5), for the words from “give notice” to “under subsection (2) of that section”, there were substituted “send a copy of the application for a permit or for a provisional advance authorisation to the relevant transport authority at the same time as he sends the application to the Permit Authority”; and

(c)

there were inserted after subsection (5) the following—

“(6)

An undertaker who fails to comply with subsection (2) or (5) commits an offence and is liable on summary conviction to a fine not exceeding level 4 on the standard scale.

(7)

In proceedings against a person for such an offence it is a defence for him to show that—

(a)

the failure was attributable to his not knowing the identity or address of a relevant transport authority, and

(b)

his ignorance was not due to any negligence on his part or to any failure to make inquiries which he ought reasonably to have made.”.

(8)

Section 105 (minor definitions) shall have effect as if there were inserted after subsection (5) the following—

“(6)

An expression used in this Part and in permit regulations (within the meaning of section 37 of the Traffic Management Act 2004) has the same meaning in this Part as in those regulations.”.

(9)

Schedule 3A shall have effect as if—

(a)

for paragraph 1, there were substituted—

“1.

This Schedule applies where a Permit Authority receives an application for a permit or for a provisional advance authorisation in respect of specified works in a specified street”;

(b)

in paragraph 2(1)(a) for “the proposed works” there were substituted “the works that are the subject of the application”;

(c)

in paragraph 2(1)(b), for “street works” there were substituted “specified works in the street to which the application relates”;

(d)

in paragraph 2(1)(c) for “highway” there were substituted “street”;

(e)

in paragraph 2(1)(d)—

(i)

for “undertakers” there were substituted “persons”;

(ii)

for “street works in that part of the highway” there were substituted “specified works in that part of the street”;

(iii)

for “notify the authority of” there were substituted “apply for a permit or provisional advance authorisation, as applicable, in respect of”;

(f)

in paragraph 2(4) for “highway”, in each place where that word occurs, there were substituted “street”;

(g)

in paragraph 2(4)(d), for the words from “given notice” to “street works” there were substituted “applied for a permit or a for provisional advance authorisation in respect of specified works”;

(h)

sub-paragraphs (5) and (6) of paragraph 2 were omitted;

(i)

paragraph 3 were omitted;

(j)

in paragraph 4(1) the words “and before completion of the works referred to in paragraph 3(1)(a) to (c)” were omitted;

(k)

in paragraph 4(2) for the words from “the execution” to the end there were substituted “the availability of permits in relation to the part of the street specified under paragraph 2(1)(c) for such period as may be specified in the direction”;

(l)

paragraph 4(4), (5) and (7) were omitted;

(m)

in paragraph 4(9) “ceases to have effect by virtue of sub-paragraph (7), or” were omitted; and

(n)

for paragraph 5 there were substituted—

“5
(1)

This paragraph applies where—

(a)

a direction under paragraph 4 has effect, and

(b)

an application for a permit, or for a provisional advance authorisation, relating to the part of the street to which the direction relates is made after the expiry of the notice period.

(2)

The Permit Authority shall, when considering the application have regard to—

(a)

whether the application could reasonably have been made during the notice period; and

(b)

the desirability of ensuring that specified works are not carried out in that street during the period specified in the direction.”.

Annotations

Commencement

I1

Reg. 37 in force at 1.4.2008, see reg. 1(1)

Footnotes

f1

Section 73A is prospectively inserted by the Traffic Management Act 2004, section 55(1).

f2

Section 74(2A) was inserted by the Transport Act 2000, section 256.

f3

Section 88(4) was amended by the Traffic Management Act 2004, section 52(6).

f4

Section 89(2) was amended by the Traffic Management Act 2004, section 52(7).

f5

Section 93(2) was amended by the Traffic Management Act 2004, section 49(3).

Notes on Part 8

Modifications

C1

Pt. 8 applied (11.1.2010) by The Traffic Management (Royal Borough of Kensington and Chelsea) Permit Scheme Order 2009 (S.I. 2009/3170), arts. 1, 4

C2

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Redbridge) Permit Scheme Order 2009 (S.I. 2009/3179), arts. 1, 4

C3

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Enfield) Permit Scheme Order 2009 (S.I. 2009/3165), arts. 1, 4

C4

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Brent) Permit Scheme Order 2009 (S.I. 2009/3142), arts. 1, 4

C5

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Ealing) Permit Scheme Order 2009 (S.I. 2009/3163), arts. 1, 4

C6

Pt. 8 applied (11.1.2010) by The Traffic Management (Transport for London) Permit Scheme Order 2009 (S.I. 2009/3186), arts. 1, 4

C7

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Wandsworth) Permit Scheme Order 2009 (S.I. 2009/3189), arts. 1, 4

C8

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Camden) Permit Scheme Order 2009 (S.I. 2009/3149), arts. 1, 4

C9

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Barnet) Permit Scheme Order 2009 (S.I. 2009/3141), arts. 1, 4

C10

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Hounslow) Permit Scheme Order 2009 (S.I. 2009/3178), arts. 1, 4

C11

Pt. 8 applied (11.1.2010) by The Traffic Management (City of Westminster) Permit Scheme Order 2009 (S.I. 2009/3187), arts. 1, 4

C12

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Hackney) Permit Scheme Order 2009 (S.I. 2009/3167), arts. 1, 4

C13

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Hammersmith and Fulham) Permit Scheme Order 2009 (S.I. 2009/3168), arts. 1, 4

C14

Pt. 8 applied (11.1.2010) by The Traffic Management (City of London Corporation) Permit Scheme Order 2009 (S.I. 2009/3162), arts. 1, 4

C15

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Lewisham) Permit Scheme Order 2009 (S.I. 2009/3171), arts. 1, 4

C16

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Islington) Permit Scheme Order 2009 (S.I. 2009/3180), arts. 1, 4

C17

Pt. 8 applied (11.1.2010) by The Traffic Management (London Borough of Haringey) Permit Scheme Order 2009 (S.I. 2009/3169), arts. 1, 4

C18

Pt. 8 applied (25.1.2010) by The Traffic Management (Kent County Council) Permit Scheme Order 2009 (S.I. 2009/3188), arts. 1, 4

C19

Pt. 8 applied (1.4.2010) by The Traffic Management (London Borough of Bromley) Permit Scheme Order 2009 (S.I. 2009/3148), arts. 1, 4

C20

Pt. 8 applied (1.4.2010) by The Traffic Management (London Borough of Croydon) Permit Scheme Order 2009 (S.I. 2009/3158), arts. 1, 4

C21

Pt. 8 applied (10.1.2011) by The Traffic Management (Northamptonshire County Council) Permit Scheme Order 2010 (S.I. 2010/2823), arts. 1, 4

C22

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Harrow) Permit Scheme Order 2011 (S.I. 2011/1961), arts. 1, 4

C23

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Richmond upon Thames) Permit Scheme Order 2011 (S.I. 2011/1960), arts. 1, 4

C24

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Waltham Forest) Permit Scheme Order 2011 (S.I. 2011/1959), arts. 1, 4

C25

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Greenwich) Permit Scheme Order 2011 (S.I. 2011/1956), arts. 1, 4

C26

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Newham) Permit Scheme Order 2011 (S.I. 2011/1962), arts. 1, 4

C27

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Southwark) Permit Scheme Order 2011 (S.I. 2011/1957), arts. 1, 4

C28

Pt. 8 applied (5.9.2011) by The Traffic Management (London Borough of Lambeth) Permit Scheme Order 2011 (S.I. 2011/1958), arts. 1, 4

C29

Pt. 8 applied (28.11.2011) by The Traffic Management (London Borough of Barking and Dagenham) Permit Scheme Order 2011 (S.I. 2011/2599), arts. 1, 4

C30

Pt. 8 applied (28.11.2011) by The Traffic Management (London Borough of Hillingdon) Permit Scheme Order 2011 (S.I. 2011/2600), arts. 1, 4

C31

Pt. 8 applied (10.4.2012) by The Traffic Management (St Helens Borough Council) Permit Scheme Order 2012 (S.I. 2012/785), arts. 1, 4

C32

Pt. 8 applied (12.6.2012) by The Traffic Management (Barnsley Metropolitan Borough Council) Permit Scheme Order 2012 (S.I. 2012/1289), arts. 1, 4

C33

Pt. 8 applied (12.6.2012) by The Traffic Management (Leeds City Council) Permit Scheme Order 2012 (S.I. 2012/1295), arts. 1, 4

C34

Pt. 8 applied (12.6.2012) by The Traffic Management (Doncaster Borough Council) Permit Scheme Order 2012 (S.I. 2012/1282), arts. 1, 4

C35

Pt. 8 applied (12.6.2012) by The Traffic Management (The Council of the Borough of Kirklees) Permit Scheme Order 2012 (S.I. 2012/1286), arts. 1, 4

C36

Pt. 8 applied (12.6.2012) by The Traffic Management (Sheffield City Council) Permit Scheme Order 2012 (S.I. 2012/1294), arts. 1, 4

C37

Pt. 8 applied (12.6.2012) by The Traffic Management (Rotherham Borough Council) Permit Scheme Order 2012 (S.I. 2012/1284), arts. 1, 4

C38

Pt. 8 applied (5.11.2012) by The Traffic Management (Southend-On-Sea Borough Council) Permit Scheme Order 2012 (S.I. 2012/2548), arts. 1, 4

C39

Pt. 8 applied (5.11.2012) by The Traffic Management (Hertfordshire County Council) Permit Scheme Order 2012 (S.I. 2012/2549), arts. 1, 4

C40

Pt. 8 applied (5.11.2012) by The Traffic Management (Bedford Borough Council) Permit Scheme Order 2012 (S.I. 2012/2541), arts. 1, 4

C41

Pt. 8 applied (5.11.2012) by The Traffic Management (Luton Borough Council) Permit Scheme Order 2012 (S.I. 2012/2547), arts. 1, 4

C42

Pt. 8 applied (14.1.2013) by The Traffic Management (London Borough of Tower Hamlets) Permit Scheme Order 2012 (S.I. 2012/3107), arts. 1, 4

C43

Pt. 8 applied (1.3.2013) by The Traffic Management (Royal Borough of Kingston upon Thames) Permit Scheme Order 2012 (S.I. 2012/3104), arts. 1, 4

C44

Pt. 8 applied (29.4.2013) by The Traffic Management (Oldham Borough Council) Permit Scheme Order 2013 (S.I. 2013/808), arts. 1, 4

C45

Pt. 8 applied (29.4.2013) by The Traffic Management (Wigan Borough Council) Permit Scheme Order 2013 (S.I. 2013/812), arts. 1, 4

C46

Pt. 8 applied (29.4.2013) by The Traffic Management (Rochdale Metropolitan Borough Council) Permit Scheme Order 2013 (S.I. 2013/809), arts. 1, 4

C47

Pt. 8 applied (29.4.2013) by The Traffic Management (Tameside Metropolitan Borough Council) Permit Scheme Order 2013 (S.I. 2013/806), arts. 1, 4

C48

Pt. 8 applied (29.4.2013) by The Traffic Management (Bury Metropolitan Borough Council) Permit Scheme Order 2013 (S.I. 2013/814), arts. 1, 4

C49

Pt. 8 applied (29.4.2013) by The Traffic Management (The Council of the City of Manchester) Permit Scheme Order 2013 (S.I. 2013/811), arts. 1, 4

C50

Pt. 8 applied (29.4.2013) by The Traffic Management (The Borough Council of Bolton) Permit Scheme Order 2013 (S.I. 2013/813), arts. 1, 4

C51

Pt. 8 applied (29.4.2013) by The Traffic Management (Salford City Council) Permit Scheme Order 2013 (S.I. 2013/810), arts. 1, 4

C52

Pt. 8 applied (29.4.2013) by The Traffic Management (Trafford Borough Council) Permit Scheme Order 2013 (S.I. 2013/807), arts. 1, 4

C53

Pt. 8 applied (29.4.2013) by The Traffic Management (The Metropolitan Borough Council of Stockport) Permit Scheme Order 2013 (S.I. 2013/805), arts. 1, 4

C54

Pt. 8 applied (1.10.2013) by The Traffic Management (Derby City Council) Permit Scheme Order 2013 (S.I. 2013/1781), arts. 1, 4

C55

Pt. 8 applied (4.11.2013) by The Traffic Management (Buckinghamshire County Council) Permit Scheme Order 2013 (S.I. 2013/2398), arts. 1, 4

C56

Pt. 8 applied (11.11.2013) by The Traffic Management (East Sussex County Council) Permit Scheme Order 2013 (S.I. 2013/2399), arts. 1, 4

C57

Pt. 8 applied (11.11.2013) by The Traffic Management (Surrey County Council) Permit Scheme Order 2013 (S.I. 2013/2389), arts. 1, 4

C58

Pt. 8 applied (1.4.2014) by The Traffic Management (Shropshire Council) Permit Scheme Order 2014 (S.I. 2014/466), arts. 1, 4

C59

Pt. 8 applied (6.5.2014) by The Traffic Management (Norfolk County Council) Permit Scheme Order 2014 (S.I. 2014/941), arts. 1, 4

C60

Pt. 8 applied (3.11.2014) by The Traffic Management (Cheshire East Borough Council) Permit Scheme Order 2014 (S.I. 2014/2460), arts. 1, 4

C61

Pt. 8 applied (5.11.2014) by The Traffic Management (Bracknell Forest Borough Council) Permit Scheme Order 2014 (S.I. 2014/2462), arts. 1, 4

C62

Pt. 8 applied (19.1.2015) by The Traffic Management (Wokingham Borough Council) Permit Scheme Order 2014 (S.I. 2014/3105), arts. 1, 4

C63

Pt. 8 applied (2.2.2015) by The Traffic Management (Warrington Borough Council) Permit Scheme Order 2014 (S.I. 2014/3108), arts. 1, 4

C64

Pt. 8 applied (2.2.2015) by The Traffic Management (Cheshire West and Chester Borough Council) Permit Scheme Order 2014 (S.I. 2014/3106), arts. 1, 4

C65

Pt. 8 applied (2.2.2015) by The Traffic Management (Sefton Metropolitan Borough Council) Permit Scheme Order 2014 (S.I. 2014/3107), arts. 1, 4

C66

Pt. 8 applied (9.2.2015) by The Traffic Management (North Tyneside Council) Permit Scheme Order 2014 (S.I. 2014/3109), arts. 1, 4

C67

Pt. 8 applied (1.3.2015) by The Traffic Management (West Berkshire Council) Permit Scheme Order 2014 (S.I. 2014/3110), arts. 1, 4

C68

Pt. 8 applied (2.3.2015) by The Traffic Management (Knowsley Metropolitan Borough Council) Permit Scheme Order 2015 (S.I. 2015/34), arts. 1, 4

C69

Pt. 8 applied (4.3.2015) by The Traffic Management (Slough Borough Council) Permit Scheme Order 2014 (S.I. 2014/3112), arts. 1, 4

C70

Pt. 8 applied (9.3.2015) by The Traffic Management (Lancashire County Council) Permit Scheme Order 2015 (S.I. 2015/38), arts. 1, 4

C71

Pt. 8 applied (16.3.2015) by The Traffic Management (Essex County Council) Permit Scheme Order 2015 (S.I. 2015/37), arts. 1, 4

C72

Pt. 8 applied (16.3.2015) by The Traffic Management (Coventry City Council) Permit Scheme Order 2014 (S.I. 2014/3311), arts. 1, 4

C73

Pt. 8 applied (16.3.2015) by The Traffic Management (Nottingham City Council) Permit Scheme Order 2015 (S.I. 2015/39), arts. 1, 4

C74

Pt. 8 applied (16.3.2015) by The Traffic Management (Warwickshire County Council) Permit Scheme Order 2014 (S.I. 2014/3310), arts. 1, 4

C75

Pt. 8 applied (30.3.2015) by The Traffic Management (Brighton and Hove City Council) Permit Scheme Order 2015 (S.I. 2015/90), arts. 1, 4

C76

Pt. 8 applied (30.3.2015) by The Traffic Management (Southampton City Council) Permit Scheme Order 2015 (S.I. 2015/105), arts. 1, 4

C77

Pt. 8 applied (30.3.2015) by The Traffic Management (Milton Keynes Council) Permit Scheme Order 2015 (S.I. 2015/91), arts. 1, 4

C78

Pt. 8 applied (31.3.2015) by The Traffic Management (Council of the City of Wakefield MDC) Permit Scheme Order 2015 (S.I. 2015/293), arts. 1, 4

C79

Pt. 8 applied (31.3.2015) by The Traffic Management (Borough Council of Calderdale) Permit Scheme Order 2015 (S.I. 2015/328), arts. 1, 4

C80

Pt. 8 applied (31.3.2015) by The Traffic Management (Derbyshire County Council) Permit Scheme Order 2015 (S.I. 2015/107), arts. 1, 4

C81

Pt. 8 applied (31.3.2015) by The Traffic Management (City of Bradford Metropolitan District Council) Permit Scheme Order 2015 (S.I. 2015/330), arts. 1, 4