Paragraph 39 I1
England, Wales and Scotland
The sign—
(a)
may only be placed in connection with works involving—
(i)
an alteration in the layout of a level crossing; or
(ii)
the placing, removal or alteration of signs on or near a level crossing; and
(b)
may be retained in place not later than the end of the period of three months beginning with the day of the completion of those works.
Annotations
Commencement
- I1
Sch. 14 para. 39 in force at 22.4.2016, see reg. 1(b)