OpenLegislation

Section 25 Mode of formation of tramways.C1C2

England, Wales and Scotland

F1 Every tramway which is hereafter authorized by special Act shall be constructed on such gauge as may be prescribed by such special Act, and if no gauge is thereby prescribed, on such gauge as will admit of the use upon such tramways of carriages constructed for use upon railways of a gauge of four feet eight inches and half an inch; and shall be laid and maintained in such manner that the uppermost surface of the rail shall be on a level with the surface of the road; F2. . .

Annotations

Textual amendments

F1

Words in s. 25 repealed (except as incorporated in, or otherwise applied by, any Act of Parliament or Provisional Order) (1.1.1993) by Transport and Works Act 1992 (c. 42), ss. 65(1)(b), 68(1), Sch. 4 Pt. I; S.I. 1992/2784, art. 2(b), Sch. 2 Pt. I

F2

Words in s. 25 repealed (5.4.1994) by Transport and Works Act 1992 (c. 42), ss. 65(1)(b), 68(1), Sch. 4 Pt.I; S.I. 1994/718, art. 2, Sch. (subject to transitional provisions in art. 3)

Modifications

C1

S. 25 incorporated (with modifications) (21.7.1994) by 1994 c. xi, s. 4(1)(2)(a)(b)(3)

S. 25 excluded (21.7.1994) by 1994 c. xi, s. 7(5)

C2

S. 25 restricted (16.3.1992) by Midland Metro Act 1992 (c. vii), s. 5(5)

Notes on Part II

Modifications

C1

Pts. II and III (ss. 22-64) modified by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), s.10

C2

Pts. II and III (ss. 22-64) modified (12.11.1992) by Greater Manchester (Light Rapid Transit System) Act 1992 (c. xviii), s.10