| Purpose | | Amount £ |
|---|
| A | General | |
| 1. | Surveying, drilling and soil sampling. | |
| 2. | Acquisition of land and rights over land. | |
| 3. | Earthworks (including land reclamation and landscaping). | |
| 4. | Fees of professional and other advisers, in connection with the implementation of the project once authorised. | |
| B | Transport systems | |
| 1. | Tunnels and bridges. | |
| 2. | Highway works, including alterations to and relocation of existing services and statutory undertakers' apparatus. | |
| 3. | Permanent way or other supporting/guiding structures. | |
| 4. | Workshops, depots, stations and other buildings. | |
| 5. | Electrical plant and equipment. | |
| 6. | Signalling and communications. | |
| 7. | Vehicles. | |
| 8. | Alteration, modification and removal of existing works. | |
| 9. | Other major items (to be specified). | |
| C | Inland waterways | |
| 1. | Tunnels, bridges and aqueducts. | |
| 2. | Canals, pounds and locks. | |
| 3. | Reservoirs, sluices, spillways and culverts. | |
| 4. | Wharves and other moorings. | |
| 5. | Diversion, alteration, modification and abandonment of existing waterways. | |
| 6. | Other major items (to be specified). | |
| D | Works which interfere with rights of navigation | |
| 1. | The principal components of each description of works prescribed by order made under section 4. | |
| 2. | Plant, equipment and ancillary works required in connection with such works. | |
| 3. | Other major items (to be specified). | |