Schedule 3 FORM OF ESTIMATE OF COSTS

Purpose Amount £
AGeneral 
1.Surveying, drilling and soil sampling. 
2.Acquisition of land and rights over land. 
3.Earthworks (including land reclamation and landscaping). 
4.Fees of professional and other advisers, in connection with the implementation of the project once authorised. 
BTransport systems 
1.Tunnels and bridges. 
2.Highway works, including alterations to and relocation of existing services and statutory undertakers' apparatus. 
3.Permanent way or other supporting/guiding structures. 
4.Workshops, depots, stations and other buildings. 
5.Electrical plant and equipment. 
6.Signalling and communications. 
7.Vehicles. 
8.Alteration, modification and removal of existing works. 
9.Other major items (to be specified). 
CInland waterways 
1.Tunnels, bridges and aqueducts. 
2.Canals, pounds and locks. 
3.Reservoirs, sluices, spillways and culverts. 
4.Wharves and other moorings. 
5.Diversion, alteration, modification and abandonment of existing waterways. 
6.Other major items (to be specified). 
DWorks which interfere with rights of navigation 
1.The principal components of each description of works prescribed by order made under section 4. 
2.Plant, equipment and ancillary works required in connection with such works. 
3.Other major items (to be specified).