Explanatory note
(This note is not part of the Order)
This Order makes further provision for tram lines at Mumps in Oldham. It authorises Transport for Greater Manchester—
to continue, maintain and operate a tramroad at Mumps in Oldham being a deviation of a tramroad previously authorised to operate on the former Middleton to Shaw railway; and
to deviate in the construction of a street tramway authorised by the Greater Manchester (Light Rapid Transit System) (Mumps Surface Crossing) Order 2001 not only within the lines or situations shown on the works plans certified for the purposes of that Order but also within the additional limits of deviation shown on the plan certified for the purposes of this Order,
and it applies to the tram lines at Mumps existing operational provisions applicable to Transport for Greater Manchester’s transit system.
A copy of the plan and sections and the book of reference are available for inspection free of charge during working hours at the offices of Transport for Greater Manchester, 2 Piccadilly Place, Manchester M1 3BG.