Schedule Scheduled Work
In the borough of Oldham
-
A tramroad (double track) approximately 130 metres in length constructed by the undertaker, by way of a deviation of the Middleton to Shaw railway, from a point north east of the former Mumps station running across the road intersection between Oldham Way, Lees Road and Mumps before terminating in the vicinity of Wallshaw Place by a junction with the commencement of Work No.2 of the Mumps Surface Crossing Order.