OpenLegislation

Schedule 3 CONFORMITY ASSESSMENT PROCEDURESF1

Repealed

(This Schedule substantially reproduces the provisions of Part 1 of Annex IV to the Transportable Pressure Equipment Directive)

  1. 1Module A—internal production control
  2. 2Paragraph 2
  3. 3Paragraph 3
  4. 4Paragraph 4
  5. 5Paragraph 5
  6. Module A1—internal manufacturing checks with monitoring of the final assessment
  7. Paragraph
  8. Paragraph
  9. Paragraph
  10. Paragraph
  11. 1Module B—EC type-examination
  12. 2Paragraph 2
  13. Paragraph
  14. Paragraph
  15. Paragraph
  16. 3Paragraph 3
  17. 4Paragraph 4
  18. 4.1Paragraph 4.1
  19. 4.2Paragraph 4.2
  20. 4.3Paragraph 4.3
  21. 4.4Paragraph 4.4
  22. 5Paragraph 5
  23. Paragraph
  24. Paragraph
  25. 6Paragraph 6
  26. 7Paragraph 7
  27. Paragraph
  28. 8Paragraph 8
  29. 9Paragraph 9
  30. Paragraph
  31. 1Module B1—EC design examination
  32. 2Paragraph 2
  33. Paragraph
  34. 3Paragraph 3
  35. 4Paragraph 4
  36. 4.1Paragraph 4.1
  37. 4.2Paragraph 4.2
  38. 4.3Paragraph 4.3
  39. 5Paragraph 5
  40. Paragraph
  41. Paragraph
  42. 6Paragraph 6
  43. 7Paragraph 7
  44. Paragraph
  45. 8Paragraph 8
  46. 9Paragraph 9
  47. Paragraph
  48. 1Module C1—conformity to type
  49. 2Paragraph 2
  50. 3Paragraph 3
  51. Paragraph
  52. 4Paragraph 4
  53. Paragraph
  54. Paragraph
  55. Paragraph
  56. 1Module D—production quality assurance
  57. 2Paragraph 2
  58. 3Quality system
  59. 3.1Paragraph 3.1
  60. 3.2Paragraph 3.2
  61. Paragraph
  62. Paragraph
  63. 3.3Paragraph 3.3
  64. Paragraph
  65. Paragraph
  66. 3.4Paragraph 3.4
  67. Paragraph
  68. Paragraph
  69. Paragraph
  70. 4Surveillance under the responsibility of the notified body
  71. 4.1Paragraph 4.1
  72. 4.2Paragraph 4.2
  73. 4.3Paragraph 4.3
  74. 4.4Paragraph 4.4
  75. Paragraph
  76. 5Paragraph 5
  77. 6Paragraph 6
  78. Paragraph
  79. 1Module D1—production quality assurance
  80. 2Paragraph 2
  81. 3Paragraph 3
  82. 4Quality system
  83. 4.1Paragraph 4.1
  84. Paragraph
  85. 4.2Paragraph 4.2
  86. Paragraph
  87. Paragraph
  88. 4.3Paragraph 4.3
  89. Paragraph
  90. Paragraph
  91. 4.4Paragraph 4.4
  92. Paragraph
  93. Paragraph
  94. Paragraph
  95. 5Surveillance under the responsibility of the notified body
  96. 5.1Paragraph 5.1
  97. 5.2Paragraph 5.2
  98. 5.3Paragraph 5.3
  99. 5.4Paragraph 5.4
  100. Paragraph
  101. 6Paragraph 6
  102. 7Paragraph 7
  103. Paragraph
  104. 1Module E—product quality assurance
  105. 2Paragraph 2
  106. 3Quality system
  107. 3.1Paragraph 3.1
  108. Paragraph
  109. 3.2Paragraph 3.2
  110. Paragraph
  111. 3.3Paragraph 3.3
  112. Paragraph
  113. Paragraph
  114. 3.4Paragraph 3.4
  115. Paragraph
  116. Paragraph
  117. Paragraph
  118. 4Surveillance under the responsibility of the notified body
  119. 4.1Paragraph 4.1
  120. 4.2Paragraph 4.2
  121. 4.3Paragraph 4.3
  122. 4.4Paragraph 4.4
  123. Paragraph
  124. 5Paragraph 5
  125. 6Paragraph 6
  126. Paragraph
  127. 1Module E1—production quality assurance
  128. 2Paragraph 2
  129. Paragraph
  130. 3Paragraph 3
  131. 4Quality system
  132. 4.1Paragraph 4.1
  133. Paragraph
  134. 4.2Paragraph 4.2
  135. Paragraph
  136. 4.3Paragraph 4.3
  137. Paragraph
  138. Paragraph
  139. 4.4Paragraph 4.4
  140. Paragraph
  141. Paragraph
  142. Paragraph
  143. 5Surveillance under the responsibility of the notified body
  144. 5.1Paragraph 5.1
  145. 5.2Paragraph 5.2
  146. 5.3Paragraph 5.3
  147. 5.4Paragraph 5.4
  148. Paragraph
  149. 6Paragraph 6
  150. 7Paragraph 7
  151. Each notified body must communicate to the other nParagraph Each notified body must communicate to the other n
  152. 1Module F—product verification
  153. 2Paragraph 2
  154. The manufacturer, or his authorised representativeParagraph The manufacturer, or his authorised representative
  155. 3Paragraph 3
  156. Paragraph
  157. 4Verification by examination and testing of each transportable pressure vessel
  158. 4.1Paragraph 4.1
  159. Paragraph
  160. 4.2Paragraph 4.2
  161. 4.3Paragraph 4.3
  162. 1Module G—EC unit verification
  163. 2Paragraph 2
  164. 3Paragraph 3
  165. Paragraph
  166. 4Paragraph 4
  167. 4.1Paragraph 4.1
  168. 4.2Paragraph 4.2
  169. Paragraph
  170. 1Module H—full quality assurance
  171. 2Paragraph 2
  172. 3Quality system
  173. 3.1Paragraph 3.1
  174. Paragraph
  175. 3.2Paragraph 3.2
  176. Paragraph
  177. Paragraph
  178. 3.3Paragraph 3.3
  179. Paragraph
  180. Paragraph
  181. 3.4Paragraph 3.4
  182. Paragraph
  183. Paragraph
  184. Paragraph
  185. 4Surveillance under the responsibility of the notified body
  186. 4.1Paragraph 4.1
  187. 4.2Paragraph 4.2
  188. 4.3Paragraph 4.3
  189. 4.4Paragraph 4.4
  190. Paragraph
  191. 5Paragraph 5
  192. 6Paragraph 6
  193. Paragraph
  194. 1Module H1—full quality assurance with design examination and special surveillance of the final test
  195. 2Paragraph 2

Annotations

Textual amendments

F1

Regulations revoked (10.5.2004) by The Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2004 (S.I. 2004/568), reg. 1, Sch. 14 (with reg. 63(5))

[Editorial note: No historical revised versions have been created for amendments to this S.I. made prior to its final revocation. Revised versions of how the S.I. stood at its first commencement are available and, to see the document content as it originally stood when it was made, select the 'Original (As Made)' version. For further details of the amendments see the List of All Changes available in 'More Resources']