OpenLegislation

Transportable Pressure Vessels Regulations (Northern Ireland) 2003 (revoked)

S.R. 2003/386 · Made 22 August 2003 · Extends to Northern Ireland

Up to date with all changes known to legislation.gov.uk, revised to 1 August 2006.

HEALTH AND SAFETY

Made 22nd August 2003

Coming into operation –

regulations 1, 2, 10 and 12(1) to (5) 1st October 2003

remaining regulations 1st December 2003

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations to the whole text

Textual amendments

F1

Regulations revoked (1.8.2006) by The Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations (Northern Ireland) 2006 (S.R. 2006/173), reg. 1, Sch. 14 (with reg. 56)

Contents

  1. Part 1: PRELIMINARY Repealed
  2. 1Citation and commencement Repealed
  3. 2Interpretation Repealed
  4. 3Application Repealed
  5. Part 2: GENERAL REQUIREMENTS Repealed
  6. 4Requirements relating to the placing on the market and use at work of transportable pressure vessels Repealed
  7. 5Transportable pressure vessels placed on the market or used at work exclusively in Northern Ireland Repealed
  8. 6Reassessment of conformity Repealed
  9. 7Periodic inspection and repeated use Repealed
  10. 8Notified bodies Repealed
  11. 9Approved bodies Repealed
  12. 10Appointment of notified bodies and approved bodies by the Executive Repealed
  13. 11Conformity marking Repealed
  14. Part 3: MISCELLANEOUS Repealed
  15. 12Fees Repealed
  16. 13Defence Repealed
  17. 14Amendments and saving Repealed
  18. Signature
  19. Schedule 1: DISAPPLICATIONS TO THESE REGULATIONS Repealed
  20. 1Paragraph 1 Repealed
  21. 2Paragraph 2 Repealed
  22. 3Paragraph 3 Repealed
  23. Schedule 2STANDARDS Repealed
  24. Schedule 3: CONFORMITY ASSESSMENT PROCEDURES Repealed
  25. (This Schedule substantially reproduces the provisions of Part 1 of Annex IV to the Transportable Pressure Equipment Directive.) Repealed
  26. 1Module A—internal production control Repealed
  27. 2Module A—internal production control Repealed
  28. 3Module A—internal production control Repealed
  29. 4Module A—internal production control Repealed
  30. 5Module A—internal production control Repealed
  31. 1Module B—EC type-examination Repealed
  32. 2Module B—EC type-examination Repealed
  33. 3Module B—EC type-examination Repealed
  34. 4Module B—EC type-examination Repealed
  35. 4.1Module B—EC type-examination Repealed
  36. 4.2Module B—EC type-examination Repealed
  37. 4.3Module B—EC type-examination Repealed
  38. 4.4Module B—EC type-examination Repealed
  39. 5Module B—EC type-examination Repealed
  40. 6Module B—EC type-examination Repealed
  41. 7Module B—EC type-examination Repealed
  42. 8Module B—EC type-examination Repealed
  43. 9Module B—EC type-examination Repealed
  44. 1Module B1—EC design examination Repealed
  45. 2Module B1—EC design examination Repealed
  46. 3Module B1—EC design examination Repealed
  47. 4Module B1—EC design examination Repealed
  48. 4.1Module B1—EC design examination Repealed
  49. 4.2Module B1—EC design examination Repealed
  50. 4.3Module B1—EC design examination Repealed
  51. 5Module B1—EC design examination Repealed
  52. 6Module B1—EC design examination Repealed
  53. 7Module B1—EC design examination Repealed
  54. 8Module B1—EC design examination Repealed
  55. 9Module B1—EC design examination Repealed
  56. 1Module C1—conformity to type Repealed
  57. 2Module C1—conformity to type Repealed
  58. 3Module C1—conformity to type Repealed
  59. 4Module C1—conformity to type Repealed
  60. 1Module D—production quality assurance Repealed
  61. 2Module D—production quality assurance Repealed
  62. 3Module D—production quality assurance Repealed
  63. 3.1Module D—production quality assurance Repealed
  64. 3.2Module D—production quality assurance Repealed
  65. 3.3Module D—production quality assurance Repealed
  66. 3.4Module D—production quality assurance Repealed
  67. 4Module D—production quality assurance Repealed
  68. 4.1Module D—production quality assurance Repealed
  69. 4.2Module D—production quality assurance Repealed
  70. 4.3Module D—production quality assurance Repealed
  71. 4.4Module D—production quality assurance Repealed
  72. 5Module D—production quality assurance Repealed
  73. 6Module D—production quality assurance Repealed
  74. 1Module D1—production quality assurance Repealed
  75. 2Module D1—production quality assurance Repealed
  76. 3Module D1—production quality assurance Repealed
  77. 4Module D1—production quality assurance Repealed
  78. 4.1Module D1—production quality assurance Repealed
  79. 4.2Module D1—production quality assurance Repealed
  80. 4.3Module D1—production quality assurance Repealed
  81. 4.4Module D1—production quality assurance Repealed
  82. 5Module D1—production quality assurance Repealed
  83. 5.1Module D1—production quality assurance Repealed
  84. 5.2Module D1—production quality assurance Repealed
  85. 5.3Module D1—production quality assurance Repealed
  86. 5.4Module D1—production quality assurance Repealed
  87. 6Module D1—production quality assurance Repealed
  88. 7Module D1—production quality assurance Repealed
  89. 1Module E—product quality assurance Repealed
  90. 2Module E—product quality assurance Repealed
  91. 3Quality system Repealed
  92. 3.1Quality system Repealed
  93. 3.2Quality system Repealed
  94. 3.3Quality system Repealed
  95. 3.4Quality system Repealed
  96. 4Surveillance under the responsibility of the notified body Repealed
  97. 4.1Surveillance under the responsibility of the notified body Repealed
  98. 4.2Surveillance under the responsibility of the notified body Repealed
  99. 4.3Surveillance under the responsibility of the notified body Repealed
  100. 4.4Surveillance under the responsibility of the notified body Repealed
  101. 5Surveillance under the responsibility of the notified body Repealed
  102. 6Surveillance under the responsibility of the notified body Repealed
  103. 1Module E1—production quality assurance Repealed
  104. 2Module E1—production quality assurance Repealed
  105. 3Module E1—production quality assurance Repealed
  106. 4Quality system Repealed
  107. 4.1Quality system Repealed
  108. 4.2Quality system Repealed
  109. 4.3Quality system Repealed
  110. 4.4Quality system Repealed
  111. 5Surveillance under the responsibility of the notified body Repealed
  112. 5.1Surveillance under the responsibility of the notified body Repealed
  113. 5.2Surveillance under the responsibility of the notified body Repealed
  114. 5.3Surveillance under the responsibility of the notified body Repealed
  115. 5.4Surveillance under the responsibility of the notified body Repealed
  116. 6Surveillance under the responsibility of the notified body Repealed
  117. 7Surveillance under the responsibility of the notified body Repealed
  118. 1Module F—product verification Repealed
  119. 2Module F—product verification Repealed
  120. 3Module F—product verification Repealed
  121. 4Verification by examination and testing of each transportable pressure vessel Repealed
  122. 4.1Verification by examination and testing of each transportable pressure vessel Repealed
  123. 4.2Verification by examination and testing of each transportable pressure vessel Repealed
  124. 4.3Verification by examination and testing of each transportable pressure vessel Repealed
  125. 1Module G—EC unit verification Repealed
  126. 2Module G—EC unit verification Repealed
  127. 3Module G—EC unit verification Repealed
  128. 4Module G—EC unit verification Repealed
  129. 4.1Module G—EC unit verification Repealed
  130. 4.2Module G—EC unit verification Repealed
  131. 1Module H—full quality assurance Repealed
  132. 2Module H—full quality assurance Repealed
  133. 3Quality system Repealed
  134. 3.1Quality system Repealed
  135. 3.2Quality system Repealed
  136. 3.3Quality system Repealed
  137. 3.4Quality system Repealed
  138. 4Quality system Repealed
  139. 4.1Quality system Repealed
  140. 4.2Quality system Repealed
  141. 4.3Quality system Repealed
  142. 4.4Quality system Repealed
  143. 5Quality system Repealed
  144. 6Quality system Repealed
  145. 1Module H1—full quality assurance with design examination and special surveillance of the final test Repealed
  146. 2Module H1—full quality assurance with design examination and special surveillance of the final test Repealed
  147. Schedule 4: MODULES TO BE FOLLOWED FOR CONFORMITY ASSESSMENT Repealed
  148. (This Schedule substantially reproduces the provisions of Annex V to the Transportable Pressure Equipment Directive.) Repealed
  149. Schedule 5: CONFORMITY REASSESSMENT PROCEDURE Repealed
  150. (This Schedule substantially reproduces the provisions of Part II of Annex IV to the Transportable Pressure Equipment Directive.) Repealed
  151. 1Paragraph 1 Repealed
  152. 2Paragraph 2 Repealed
  153. 3Paragraph 3 Repealed
  154. 4Paragraph 4 Repealed
  155. 5Paragraph 5 Repealed
  156. Schedule 6: PERIODIC INSPECTION PROCEDURES Repealed
  157. (This Schedule substantially reproduces the provisions of Part III of Annex IV to the Transportable Pressure Equipment Directive.) Repealed
  158. 1Module 1—periodic inspection of products Repealed
  159. 2Module 1—periodic inspection of products Repealed
  160. 3Module 1—periodic inspection of products Repealed
  161. 3.1Module 1—periodic inspection of products Repealed
  162. 3.2Module 1—periodic inspection of products Repealed
  163. 3.3Module 1—periodic inspection of products Repealed
  164. 1Module 2—periodic inspection through quality assurance Repealed
  165. 2Module 2—periodic inspection through quality assurance Repealed
  166. 3Quality system Repealed
  167. 3.1Quality system Repealed
  168. 3.2Quality system Repealed
  169. 3.3Quality system Repealed
  170. 3.4Quality system Repealed
  171. 4Surveillance under the responsibility of the notified body Repealed
  172. 4.1Surveillance under the responsibility of the notified body Repealed
  173. 4.2Surveillance under the responsibility of the notified body Repealed
  174. 4.3Surveillance under the responsibility of the notified body Repealed
  175. 4.4Surveillance under the responsibility of the notified body Repealed
  176. 5Surveillance under the responsibility of the notified body Repealed
  177. Schedule 7: CONFORMITY MARKING Repealed
  178. (This Schedule substantially reproduces the provisions of Annex VII to the Transportable Pressure Equipment Directive.) Repealed
  179. Schedule 8: AMENDMENTS TO THE CDGCPL REGULATIONS Repealed
  180. 1Paragraph 1 Repealed
  181. 2Paragraph 2 Repealed
  182. 3Paragraph 3 Repealed
  183. 4Paragraph 4 Repealed
  184. 5Paragraph 5 Repealed
  185. 6Paragraph 6 Repealed
  186. 7Paragraph 7 Repealed
  187. 8Paragraph 8 Repealed
  188. Explanatory note