The Triton Knoll Electrical System (Correction) Order 2017
S.I. 2017/467 · Made 23 March 2017
Infrastructure Planning
Made 23rd March 2017
Coming into force 24th March 2017
Before the end of the relevant period, as defined in paragraph 1(6)(a) of Schedule 4 to the Act, the Secretary of State received a written request from the applicantf4 for the correction of errors and omissions in the Order.
In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State has informed the relevant local planning authoritiesf5 that the request has been received.
The Secretary of State, in exercise of the powers conferred by section 119 of, and paragraphs 1(4) and (8) of Schedule 4, to the Act, makes the following Order:
Annotations to the whole text
Footnotes
- f1
- f2
- f3
-
As provided for in Schedule 4 to the Act.
- f4
-
As defined in paragraph 4 of Schedule 4 to the Act.
- f5
-
A relevant local planning authority means a local planning authority for all or any part of the area in which the land to which the decision relates is situated, under paragraph 4 of Schedule 4 to the Act.
Contents
1Citation and commencement
This Order may be cited as the Triton Knoll Electrical System (Correction) Order 2017 and comes into force on 24th March 2017.
2Corrections
The Triton Knoll Electrical System Order 2016 is corrected as set out in the table in the Schedule to this Order, where—
the first column sets out where the correction is to be made;
the second column sets out how the correction is to be made; and
the third column sets out the text to be substituted, inserted, or omitted.
Signature
Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy
Giles Scott
Head of Energy Infrastructure Planning and Coal Liabilities
Department for Business, Energy and Industrial Strategy
23rd March 2017
Table
| Where the correction is to be made | How the correction is to be made | Text to be substituted, inserted, or omitted |
|---|---|---|
| Preamble | For “RWE Innogy UK Ltd” substitute | “Innogy Renewables UK Limited” |
| Article 2(1), definition of “cable ducts” | For “electrical cables” substitute | “electrical circuits” |
| Article 2 | After paragraph (5) insert |
|
| Article 35(1)(k) | For “the outline code of construction practice (onshore) (rev. C)” substitute | “the outline code of construction practice (onshore) (rev. B)” |
Schedule 1, Part 3, Requirement 5(10) | After “within Work Nos.” omit | “2,” |
| Schedule 5, table for East Lindsey District, second column, first entry, paragraph (c) | For “with consent for mole requests to be determined within 24 hours not including weekend or bank holiday hours” substitute | “with consent for mole draining requests to be determined within 24 hours not including weekend or bank holiday hours” |
| Schedule 5, table for Boston Borough, second column, first entry, paragraph (c) | After “without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed” insert | “, with consent for mole draining requests to be determined within 24 hours not including weekend or bank holiday hours,” |
Explanatory note
(This note is not part of the Order)
The Order corrects errors and omissions in the Triton Knoll Electrical System Order 2016, a development consent order made under the Planning Act 2008, following a request from the applicant under paragraph 1(5)(a) of Schedule 4 to that Act.