Paragraph 4 Further offshore design requirementsI1

England, Wales and Scotland

No wind turbine generator F1or collector substation forming part of the authorised development shall be erected within the areas hatched black on the Works plan, whose coordinates are specified below—

PointLatitude (DMS)Longitude (DMS)PointLatitude (DMS)Longitude (DMS)
153° 26′ 33.465″ N0° 49′ 43.804″ E253° 26′ 50.747″ N0° 48′ 50.232″ E
353° 29′ 53.970″ N0° 54′ 07.524″ E453° 29′ 24.316″ N0° 54′ 38.088″ E

Annotations

Textual amendments

F1

Words in Sch. 1 para. 4 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 6(2)