Paragraph 5 Further offshore design requirementsI1
England, Wales and Scotland
No steel monopile foundation forming part of the authorised scheme shall—
in the case of a steel monopile foundation have a diameter of more than 7 metres for use with meteorological stations and for use in all other instances a diameter of more than 8.5 metres; and
in the case of a concrete monopile foundation have a diameter of more than 8.5 metres for use with meteorological stations and for use in all other instances a diameter of more than 10.5 metres.
No gravity base foundation forming part of the authorised scheme shall have—
for use with large HVDC substations or combined substations a length at the level of the seabed of more than 100 metres, a width of 15 metres or a height of more than 15 metres; or for use in all other instances, a diameter at the level of the seabed of more than 45 metres;
a base height, where there is a flat base, of more than 7 metres above the level of the seabed;
a cone/column intersect which is higher than 32 metres above the top of the base;
a cone diameter of more than 45 metres at its base;
a column diameter, where there is a flat or conical base, of more than 10 metres.
No jacket foundation forming part of the authorised scheme shall have—
for use with wind turbine generators a width spacing between each leg at the level of the seabed of more than 30 metres and more than 4 legs;
a pile diameter of more than 3 metres;
more than one pile per leg or more than one suction can per leg;
for use with offshore substations, combined substations or large HVDC substations more than 8 legs; and for use with combined substations more than 16 legs;
a suction can which is more than 14 metres in diameter.
No suction bucket monopod foundation forming part of the authorised scheme shall have—
a diameter at the level of the seabed of more than 25 metres;
a column diameter of more than 10.5 metres.
No tripod foundation forming part of the authorised development shall have—
more than three legs;
a brace diameter of more than 5.5 metres;
a pile diameter of more than 3 metres;
more than one pile per leg;
a column diameter of more than 8 metres;
a suction can which is more than 14 metres in diameter.