Paragraph 2 Further offshore design requirementsI1
England, Wales and Scotland
No wind turbine generator, HVDC substation, large HVDC substation, collector substation, combined substation or meteorological station forming part of the authorised development shall be erected within the areas hatched black on the Works plan, whose coordinates are specified below—
Coordinates for restricted build area
| Point | Latitude (DMS) | Longitude (DMS) | Point | Latitude (DMS) | Longitude (DMS) |
|---|---|---|---|---|---|
| 1 | 53° 26′ 33.465″ N | 0° 49′ 43.804″ E | 2 | 53° 26′ 50.747″ N | 0° 48′ 50.232″ E |
| 3 | 53° 29′ 53.970″ N | 0° 54′ 07.524″ E | 4 | 53° 29′ 24.316″ N | 0° 54′ 38.088″ E |
Annotations
Commencement
- I1
Sch. 2 Pt. 2 para. 2 in force at 12.7.2013, see art. 1