OpenLegislation

Schedule 4 INDUSTRIAL WASTE WATERI1

Northern Ireland

Industrial waste water entering collecting systems and urban waste water treatment plants shall be subject to such pre-treatment as is required in order to—

  • protect the health of staff working in collecting systems and treatment plants;

  • ensure that collecting systems, waste water treatment plants and associated equipment are not damaged;

  • ensure that the operation of the waste water treatment plant and the treatment of sludge are not impeded;

  • ensure that discharges from the treatment plants do not adversely affect the environment, or prevent receiving water from complying with F1F2assimilated law; and

  • ensure that sludge can be disposed of safely in an environmentally acceptable manner.

Annotations

Textual amendments

F1

Words in Sch. 4 substituted (31.12.2020) by The Water (Amendment) (Northern Ireland) (EU Exit) Regulations 2019 (S.I. 2019/112), regs. 1(1), 5(6); 2020 c. 1, Sch. 5 para. 1(1)

F2

Word in Sch. 4 substituted (27.2.2025) by The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) Regulations 2025 (S.I. 2025/82), reg. 1(2), Sch. 10 para. 11(d)

Commencement

I1

Sch. 4 in operation at 1.4.2007, see reg. 1