Schedule 4 INDUSTRIAL WASTE WATERI1
Northern Ireland
Industrial waste water entering collecting systems and urban waste water treatment plants shall be subject to such pre-treatment as is required in order to—
protect the health of staff working in collecting systems and treatment plants;
ensure that collecting systems, waste water treatment plants and associated equipment are not damaged;
ensure that the operation of the waste water treatment plant and the treatment of sludge are not impeded;
ensure that discharges from the treatment plants do not adversely affect the environment, or prevent receiving water from complying with F1F2assimilated law; and
ensure that sludge can be disposed of safely in an environmentally acceptable manner.
Annotations
Textual amendments
- F1
Words in Sch. 4 substituted (31.12.2020) by The Water (Amendment) (Northern Ireland) (EU Exit) Regulations 2019 (S.I. 2019/112), regs. 1(1), 5(6); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Word in Sch. 4 substituted (27.2.2025) by The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) Regulations 2025 (S.I. 2025/82), reg. 1(2), Sch. 10 para. 11(d)
Commencement
- I1
Sch. 4 in operation at 1.4.2007, see reg. 1