OpenLegislation

Section 3 Significant modification of VL scheme: adjusted implementation periodsI1I2

Scotland

(1)

Section 14 of the 2024 Act (required content of a scheme) is modified as follows.

(2)

In subsection (3), the words “, or on which a significant modification is to take effect,” are repealed.

(3)

After subsection (3) insert—

“(3A)

If a VL scheme is in force, the date on which a significant modification of the scheme is to take effect—

(a)

in the case of a modification of the type mentioned in paragraph (a) or (c) of subsection (4), must be at least 18 months after the date on which the local authority publishes a report under section 13(1)(c) stating that it intends to proceed with the original or modified proposal,

(b)

in the case of a modification of the type mentioned in paragraph (b), (ba) or (bb) of subsection (4), must be at least 6 months after the date on which the local authority publishes a report under section 13(1)(c) stating that it intends to proceed with the original or modified proposal.

(3B)

If a VL scheme is not yet in force, the date on which a significant modification of the scheme is to take effect must be at least 18 months after the date on which the local authority publishes a report under section 13(1)(c) stating that it intends to proceed with the original or modified proposal.”.

(4)

In subsection (4), for “subsection (3)” substitute “subsections (3A) and (3B)”.

Annotations

Commencement

I1

S. 3 not in force at Royal Assent, see s. 16(3)

I2

S. 3 in force at 22.7.2026 by S.S.I. 2026/198, reg. 2 (with reg. 3)