Paragraph 2 Design parameters for other depositsI1
England and Wales
(1)
The total volume of scour protection for use with the offshore substation platforms in Work No. 2(a) shall not exceed 125,100m³.
(2)
The total volume of cable protection (excluding cable crossings) within Work No. 3A shall not exceed 109,650m³ with a maximum footprint of 142,139m².
(3)
The total volume of cable protection associated with cable crossings included within Work No. 3A shall not exceed 125,955m³ with a maximum footprint of 144,548m².
Annotations
Commencement
- I1
Sch. 10 Pt. 2 para. 2 in force at 28.11.2014, see art. 1