The Walsall Metropolitan Borough Council (York’s Bridge Replacement Scheme) Bridge Scheme 2014 Confirmation Instrument 2014
S.I. 2014/1799 · Made 4 July 2014
Highways, England
Made 4th July 2014
Coming into force in accordance with article 1
The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980f1, and now vested in the Secretary of State f2:
Annotations to the whole text
Footnotes
- f1
- f2
Contents
- 1Section 1
- 2Section 2
- 3Section 3
- Signature
- Schedule THEHE WALSALL METROPOLITAN BOROUGH COUNCIL (YORK’S BRIDGE REPLACEMENT SCHEME) BRIDGE SCHEME 2014
- Schedule THE SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE WALSALL METROPOLITAN BOROUGH COUNCIL (YORK’S BRIDGE REPLACEMENT SCHEME) BRIDGE SCHEME 2014
- Explanatory note
1
This Instrument may be cited as “The Walsall Metropolitan Borough Council (York’s Bridge Replacement Scheme) Bridge Scheme 2014 Confirmation Instrument 2014” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.
2
The Walsall Metropolitan Borough Council (York’s Bridge Replacement Scheme) Bridge Scheme 2014 Confirmation Instrument 2014 (“the Scheme”) is hereby confirmed with modifications.
3
The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of the Council of Walsall Metropolitan Borough Council, The Civic Centre, Darwell Street, Walsall, WS1 1TP.
Signature
Signed by authority of the Secretary of State for Transport
M R Fawcett
A Senior Civil Servant in the Department for Transport
4th July 2014
Schedule THEHE WALSALL METROPOLITAN BOROUGH COUNCIL (YORK’S BRIDGE REPLACEMENT SCHEME) BRIDGE SCHEME 2014
Walsall Metropolitan Borough Council (hereinafter referred to as “the Council”) make this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:-
The Council are authorised to construct over the navigable waters of the Wyrley and Essington Canal (“the Canal”) the bridge specified in the Schedule to this Scheme as part of the new highway which they are proposing to construct as part of the realignment and improvement of the B4154, Norton Road between Moat Farm Way and a point approximately 300m north of the canal in the area of Pelsall in the Borough of Walsall in the said County of the West Midlands.
This Scheme may be cited as the Walsall Metropolitan Borough Council (York’s Bridge Replacement Scheme) Bridge Scheme 2014.
Given under the seal of the Council on the 7th day of February 2014.
THE COMMON SEAL of WALSALL METROPOLITAN BOROUGH COUNCIL was hereto affixed in the presence of:
Authorised Signatory
Schedule THE SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE WALSALL METROPOLITAN BOROUGH COUNCIL (YORK’S BRIDGE REPLACEMENT SCHEME) BRIDGE SCHEME 2014
The location and general design of the Bridge are shown on the plans numbered MP/YB/BRO/01, MP/YB/BRO/02 and MP/YB/BRO/03 and marked “The Walsall Metropolitan Borough Council (York’s Bridge Replacement Scheme) Bridge Scheme 2014” sealed with the common seal of the Council and deposited at all reasonable hours at Walsall Metropolitan Borough Council, The Civic Centre, Darwell Street, Walsall, WS1 1TP and at the offices of the Secretary of State.
POINTS OF COMMENCEMENT AND TERMINATION
Explanatory note
(This note is not part of the Order)
This instrument confirms a scheme to construct over the navigable waters of the Wyrley and Essington Canal the bridge specified in the Schedule to this Scheme as part of the new highway which they are proposing to construct as part of the realignment and improvement of the B4154, Norton Road between Moat Farm Way and a point approximately 300m north of the canal in the area of Pelsall in the Borough of Walsall in the said County of the West Midlands.
The Secretary of State has modified this scheme as follows:
In the title of the Scheme WALSALL METROPOLITAN BOROUGH COUNCIL (hereinafter referred to as “the Council”) make this Order in exercise of their powers under section 106 (3) of the Highways Act 1980 and of all other powers enabling them in that behalf:- has been amended to WALSALL METROPOLITAN BOROUGH COUNCIL (hereinafter referred to as “the Council”) make this Scheme in exercise of their powers under section 106 (3) of the Highways Act 1980 and of all other powers enabling them in that behalf.
The title THE SCHEDULE TO THE ORDER has been amended to THE SCHEDULE TO THE SCHEME.
Five additional measurements have been included on drawing MP/YB/BRO/03 and annotated as modifications to the map.
One additional measurement has been included on drawing MP/YB/BRO/01 and annotated as a modification to the map.