OpenLegislation

Regulation 16 General interpretation

(1)

In this Part—

  • “the 1990 Act” means the Town and Country Planning Act 1990 M1;

  • “the 2004 Act” means the Planning and Compulsory Purchase Act 2004 M2;

  • “the 2008 Act” means the Planning Act 2008 M3;

  • F1“the 2024 Act” means the Infrastructure (Wales) Act 2024;

  • “infrastructure consent” means the consent required by section 19 of the 2024 Act;

  • “local planning authority” has the same meaning as in 1990 Act;

  • “mineral planning authority” has the same meaning as in section 1 of the 1990 Act M4;

  • “planning permission” has the meaning given in section 336 of the 1990 Act M5.

(2)

In this Part, “the planning Acts” means—

(a)

the 1990 Act;

(b)

the Planning (Listed Buildings and Conservation Areas) Act 1990 M6;

(c)

the Planning (Hazardous Substances) Act 1990 M7;

(d)

the Planning (Consequential Provisions) Act 1990 M8;

(e)

the 2004 Act; F2...

(f)

the 2008 Act F3; F4...

(g)

the Historic Environment (Wales) Act 2023 F5; and

(h)

the 2024 Act.

(3)

In this Part, “planning authority” means—

(a)

a local planning authority;

F6(ba)

a local planning authority or minerals and waste planning authority for the purposes of Part 2 of the 2004 Act;

(c)

a person appointed under paragraph 1 of Schedule 6 to the 1990 Act M9;

(d)

a government department in respect of its functions under the planning Acts; or

(e)

an appropriate authority in respect of its functions under the planning Acts.

Annotations

Textual amendments

F1

Words in reg. 16(1) inserted (15.12.2025) by The Infrastructure (Wales) Act 2024 (Consequential, Transitional, Revocation and Saving Provisions) Regulations 2025 (S.I. 2025/1192), regs. 1(2)(b), 6(2)(a)

F2

Word in reg. 16(2) omitted (4.11.2024) by virtue of The Historic Environment (Wales) Act 2023 (Consequential Provision) (Secondary Legislation) Regulations 2024 (S.I. 2024/924), regs. 1(2), 56(a)

F3

Reg. 16(2)(g) and word inserted (4.11.2024) by The Historic Environment (Wales) Act 2023 (Consequential Provision) (Secondary Legislation) Regulations 2024 (S.I. 2024/924), regs. 1(2), 56(b)

F4

Word in reg. 16(2)(f) omitted (15.12.2025) by virtue of The Infrastructure (Wales) Act 2024 (Consequential, Transitional, Revocation and Saving Provisions) Regulations 2025 (S.I. 2025/1192), regs. 1(2)(b), 6(2)(b)(i)

F5

Reg. 16(2)(h) and word inserted (15.12.2025) by The Infrastructure (Wales) Act 2024 (Consequential, Transitional, Revocation and Saving Provisions) Regulations 2025 (S.I. 2025/1192), regs. 1(2)(b), 6(2)(b)(ii)

F6

Reg. 16(3)(ba) substituted for reg. 16(3)(b) (25.3.2026) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(3)(b), Sch. 8 para. 32 (with s. 247); S.I. 2026/169, reg. 3(f)(xi) (with Sch. 1)

Marginal citations

M1

1990 c. 8.

M2

2004 c. 5.

M3

2008 c. 29.

M4

Section 1 was amended by the Local Government (Wales) Act (c. 19), section 18(3) and (4).

M5

The definition of “planning permission” in section 336 was amended by the Planning and Compensation Act 1991 (c. 34), sections 32 and 84(6) and Schedules 7 and 19.

M6

1990 c. 9.

M7

1990 c. 10.

M8

1990 c. 11.

M9

Paragraph 1 was inserted by the Planning and Compensation Act 1991 (c. 34), section 32.