Schedule 1 Permitted Controlled ActivitiesI1
Northern Ireland
Column 1 Activity | Column 2 Conditions | ||
|---|---|---|---|
1. The construction, alteration or operation of the following descriptions of weir namely :
| |||
| 2. The abstraction of less than 10 m3 of water in any one day. |
| ||
| 3. The abstraction of between 10m3 and 20m3 of water in any one day. |
| ||
4.The abstraction from a borehole where the total volume of water abstracted is less than 150 m3 in any period of one year and the purpose of the abstraction is either:
|
| ||