Paragraph 2 I1
England and Wales
The base of the silo must—
(a)
extend beyond any walls of the silo,
(b)
be provided at its perimeter with channels designed and constructed so as to collect any silage effluent that escapes from the silo, and
(c)
have adequate provision for the drainage of that effluent from those channels to an effluent tank through a channel or pipe.
Annotations
Commencement
- I1
Sch. 5 para. 2 in force at 1.4.2021, see reg. 1(3)