Paragraph 9 I1
England and Wales
If the walls of the slurry storage tank are not impermeable, the base of the tank must—
(a)
extend beyond the walls;
(b)
be provided with channels designed and constructed so as to collect any slurry that escapes from the tank;
(c)
have adequate provision for the drainage of the slurry from those channels to an effluent tank through a channel or pipe.
Annotations
Commencement
- I1
Sch. 6 para. 9 in force at 1.4.2021, see reg. 1(3)