OpenLegislation

Paragraph 9 I1

England and Wales

If the walls of the slurry storage tank are not impermeable, the base of the tank must—

(a)

extend beyond the walls;

(b)

be provided with channels designed and constructed so as to collect any slurry that escapes from the tank;

(c)

have adequate provision for the drainage of the slurry from those channels to an effluent tank through a channel or pipe.

Annotations

Commencement

I1

Sch. 6 para. 9 in force at 1.4.2021, see reg. 1(3)