Paragraph 30 Group housingI1
England and Wales
For gilts after service and pregnant sows, a part of the area required in paragraph 29 equal to at least 0.95 m2 per gilt and at least 1.3 m2 per sow must be of continuous solid floor of which a maximum of 15% is reserved for drainage openings.
Annotations
Commencement
- I1
Sch. 8 para. 30 in force at 24.10.2007, see reg. 1