Schedule 1 CORRECTIONS
| Column (1) Where the correction is made | Column (2) How correction is made | Column (3) Text substituted, inserted or omitted |
|---|---|---|
| Article 2(1) (interpretation), definition of “date of decommissioning” | For “phase” substitute | “part” |
| Omit | “as approved under requirement 2 of Schedule 2 (requirements)” | |
| Article 2(1), definition of “date of final commissioning” | For “approved” substitute | “submitted” |
| Article 2 (interpretation) | In paragraph (3) for “includes” substitute | “include” |
| Article 23 (private rights) | In Paragraph (1)(a), after “agreement”, insert | “or through the grant of a lease of the land by agreement” |
| In paragraph (1)(a), before the final “or”, insert | “;” | |
| Article 31 (statutory undertakers) | In sub-paragraph (b), after “remove” insert | “, relocate the rights of” |
| Article 38 (felling or lopping of trees and removal of hedgerows) | In paragraph (1), before sub-paragraph (a), insert | “(a) obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development;” |
| In paragraph (2), for “paragraph (2)” substitute | “paragraph (3)” | |
| In paragraph (4), for “paragraph (2)” substitute | “paragraph (3)” | |
| Schedule 2 (requirements), paragraph 1 (interpretation), (definition) of “relevant planning authority” | In sub-paragraph (a), omit | paragraph (vi) |
| In sub-paragraph (b)(viii), for “Requirement 1”, substitute | “Requirement 14” | |
| Schedule 2, paragraph 4 (community liaison group) | In sub-paragraph (3), for “approved” substitute | “submitted” |
| Schedule 2, paragraph 7 (landscape and ecological management plan) | In sub-paragraph (4), for “2(1)(h)” substitute | “(h)” |
| In sub-paragraph (4), after “permitted preliminary works”, insert | “as defined in article 2(1)” | |
| Schedule 2, paragraph 12 (archaeology) | In sub-paragraph (1)(c), for “improved” substitute | “approved” |
| In sub-paragraph (2), for “sub-paragraph 1(c)”, substitute | “sub-paragraph (1)(c)” | |
| Schedule 2, paragraph 17 (permissive path) | In sub-paragraph (2), for “365” substitute | “364” |
| Schedule 2, paragraph 21 (decommissioning and restoration) | In sub-paragraph (1), omit | “as approved under requirement 2 of schedule 2 (requirements)” |
| Schedule 2, paragraph 22 (long term flood risk mitigation) | In sub-paragraph (1), for “following consultation”, substitute | “in consultation” |
| Schedule 13 (documents and plans to be certified), Part 1 (documents and plans), row 2 (“book of reference”) | In column (2) (document reference), for “DEC/WB4.3”, substitute | “EN010132/DEC/WB4.3” |
| Schedule 13, Part 1, row 6 (“environmental statement appendix 9.12 biodiversity net gain report”) | Omit | the entire row |
| Schedule 13, Part 1, row 7 (“figure 8.18.3 landscape and ecological mitigation and enhancement measures West Burton 3 (Revision B)”) | Omit | the entire row |
| Schedule 13, Part 1, row 11 (“outline construction traffic management plan”) | In column (2) (document reference) for “EN010132/EX4/WB6.14.2”, substitute | “EN010132/EX7/WB6.3.14.2” |
| Schedule 13, Part 1, row 13 (“outline decommissioning statement”) | In column (2) (document reference), for “EN10132/EX6/WB7.14” , substitute | “EN010132/DEC/WB7.2” |
| In column (3) (revision number), for “B”, substitute | “C” | |
| In column (4) (date), for “April 2024”, substitute | “October 2024” | |
| Schedule 13, Part 1, row 17 (“outline operational environmental management plan”) | In column (2) (document reference), for “EN01032/EX5/WB7.14“, substitute | “EN010132/DEC/WB7.14” |
| In column (3) (revision number), for “D”, substitute | “E” | |
| In column (4), for “April 2024”, substitute | “October 2024” | |
| Schedule 13, Part 2 (substitute and supplementary documents), row 8 (technical note on cumulative effects of additional schemes) | In column (5) (examination library reference), for “[TBC]”, substitute | “[REP7-016]” |
| Schedule 13, Part 2 | At the end of the table, insert a new row, and in column (1) (originating document), insert | “Environmental Statement” |
| in column (2) (replacement or supplementary part), insert | “Environmental statement appendix 9.12 biodiversity net gain report” | |
| in column (3) (document reference), insert | “EN010132/DEC/WB6.3.9.12_A” | |
| in column 4 (date), insert | “November 2024” | |
| in column (5) (examination library reference), insert | “N/A” | |
| Schedule 13, Part 2 | At the end of the table, insert a new row, and in column (1) (originating document), insert | “Environmental Statement” |
| in column (2) (replacement or supplementary part), insert | “Figure 8.18.3: Landscape and Ecology Mitigation and Enhancement Measures West Burton 3” | |
| in column (3) (document reference), insert | “EN10132/DEC/6.4.8.18.3_B” | |
| in column (4) (date), insert | “October 2024” | |
| in column (5) (examination library reference), insert | “N/A” | |
| Schedule 15 (protective provisions), Part 3 (for the protection of National Grid Electricity Transmission Plc as electricity undertaker), paragraph 33 (notices) | For “article”, substitute | “article 44” |
| Schedule 15, Part 14 (for the protection of Uniper UK Limited), paragraph 192 (retained apparatus) | For “paragraph, 200”, substitute | “paragraph 200” |
| Schedule 15, Part 17 (for the protection of Tillbridge Solar Project Limited), paragraph 220 | For ““Tillbridge Work No. [ ] Area” means the area for Work No. [ ] authorised in the Tillbridge Solar Order;”, substitute | “Tillbridge Work No. 4E” means the area for Work No. 4E authorised in the Tillbridge Solar Order;” |
| Schedule 15, Part 17 (for the protection of Tillbridge Solar Project Limited) | For “Tillbridge Work No. [] Area”, in each place it occurs, substitute | “Tillbridge Work No. 4E” |
| Schedule 15, Part 18 – For the Protection of EDF Energy (Thermal Generation) Limited, paragraph 240 (acquisition of land) | In sub-paragraph (1), in both places it appears, for “order”, substitute | “Order” |
| In sub-paragraph (1), for “or the interest”, substitute | “other interest” | |
| In sub-paragraph (1), for “done”, substitute | “than” | |
| In sub-paragraph (1), at the end, insert | “such agreement not to be unreasonably withheld” | |
| Schedule 15, Part 18 – For the Protection of EDF Energy (Thermal Generation) Limited, paragraph 250 (notices) | For “article”, substitute | “article 44” |