OpenLegislation

Part 1 STREETS TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1) Area(2) Street to be stopped up(3) Extent of stopping up(4) New street to be substituted
District of South Staffordshire and Parish of PenkridgeGravelly WayThe existing highway along the length shown hatched red between points (i) and (ii) on the access and rights of way plans (Document 2.3A).New highway along the length tinted grey between points A and B on the access and rights of way plans (Document 2.3A).