Part 1 PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
| (1) Area | (2) Public right of way to be stopped up | (3) Extent of stopping up |
|---|---|---|
| District of South Staffordshire and Parish of Penkridge | Public footpath Penkridge 29 | The length of existing footpath shown with a dashed red line between the points (iii) and (iv) on the access and rights of way plans (Document 2.3A). |